BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Weatherford, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of May 22, 2024, this project has not yet been awarded. A timeline for award has not yet been established. La Dorada Phase 1 Subdivision Improvement All Questions Must Be Sent to Chucks@barronstark.com SPECIFICATIONS: The materials and methods of construction of all work within the scope of this proposal shall be governed by the current Parker County and/or Cresson Crossroads MUD No. 2 Standard Specifications for paving, grading, drainage, water, and sanitary sewer construction. For items not addressed by Parker County or MUD Standard Specifications, the North Central Texas Council of Governments (NCTCOG) Standard Specifications for Public Works Construction shall apply. Any reference to TxDOT specifications shall mean the Texas Department of Transportation Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges, current addition. 3. SCOPE OF WORK: The work for this project consists of furnishing all materials, labor, equipment, tools and incidentals to construct paving, grading, drainage, water, & sanitary sewer in accordance with the plans and specifications "Construction Plans La Dorada - Phase 1" complete in its entirety without exception. The scope of work for La Dorada - Phase 1 includes a significant amount of perimeter street improvements within Kelly Ranch Parkway & La Dorada Trail. The perimeter street drawings are contained in a separate plan set "Construction Plans Kelly Ranch Parkway & La Dorada Trail" which is a part of these contract documents also. Bidders should have in their possession both sets of bid documents. The perimeter street plans have been designed to include the full scope of perimeter street construction, only a portion of which is within the La Dorada Phase 1 scope of work. The following specific scope is to be bid with La Dorada Phase 1: Kelly Ranch Parkway Excavation Sta 55+00 to 69+60 Kelly Ranch Parkway Paving Sta 56+10 to 69+60 La Dorada Trail Excavation Sta 10+10 to 58+74 La Dorada Trail Paving Sta 27+87 to 58+74 12" Water Line 1 Sta 80+50 to 105+72 8" Water Line 3 Sta 0+00 to 12+70 8" Water Line 5 Sta 0+00 to 29+94 6" Raw Water Line 1 Sta 56+00 to 80+78 6" Raw Water Line 2 Sta 0+00 to 31+94 6" Force Main Sta 0+00 to 28+00 Culvert 4 Culvert 5 Culvert 6 Culvert 7

Post-Bid

Roads / Highways

$500,000.00

Public - County

Paving, Site Work

131

6

3

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
87
Bidding Soon
3,379
All Active Projects
1,349
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

June 3, 2024

img_map_placeholder

Kelly Ranch Parkway & La Dorada Trail, Weatherford, TX

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.