EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 5, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Avondale, Arizona. Completed plans call for site work for a water / sewer project.

Avondale Boulevard Well Transmission Main All questions must be in writing and submitted through OpenGov no later than May 15, 2024, by 5:00 p.m. The City of Avondale will endeavor to ensure every way possible that disadvantaged business enterprises (DBE) shall have every opportunity to participate in providing materials/services without being discriminated against on grounds of race, religion, sex, age, or natural origin. DBE businesses are encouraged to submit on this solicitation. Safe Site project # 22-07-2821 The Work included in this Project consists of the installation of 349 linear feet of HDPE conduit installed by directional drill, and 3,831 linear feet with appurtenances of a new 12-inch DIP well transmission main within W Van Buren Street and Avondale Boulevard for the Boulevard Well located at the southwest corner of Avondale Boulevard and I-10 off ramp. The City is issuing this IFB to secure a qualified and licensed A General Engineering or KA Dual Engineering Contractor to perform the Work and provide Materials as more particularly described in the Specifications attached to this IFB, and incorporated herein by reference. Bidders must submit Bids encompassing the entire Project, inclusive of the related Plans, Specifications, related construction drawings and Reference Documents. Failure to do so may result in a determination that the Bid is non-responsive. Site Location: The project is located at W Van Buren Street and Avondale Boulevard, within the City of Avondale, Arizona..

Award

Water / Sewer

$1,929,356.00

Public - City

Site Work

16

10

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
27
Bidding Soon
659
All Active Projects
291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

July 29, 2024

img_map_placeholder

W Van Buren St & Avondale Blvd, Avondale, AZ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Boulevard Well Transmission Main Avondale Boulevard

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.