EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Richards HS - LBP Mitigation & Surface Stabilization. Contractor/Vendor shall provide a Proposal for the necessary Labor and Materials to perform environmental mitigation activities within the areas identified in the Project Manual, dated April 24, 2024, prepared by Carnow, Conibear & Assoc., Ltd. Lead-Based Paint Mitigation and Surface Stabilization for Renovation Painting Basement Floor o Student Cafeteria 005 (Scope Sheet 2 and Drawing LBP-1) First Floor o Classroom 101 (Scope Sheet 3 and Drawing LBP-2) o Programming Office 105A (Scope Sheet 4 and Drawing LBP-2) o Toilet Room 102T (Scope Sheet 5 and Drawing LBP-2) o Stairwell 1-B (Scope Sheet 6 and Drawing LBP-2) o Stairwell 401S (Scope Sheet 6 and Drawing LBP-3) Second Floor o Classroom 201 (Scope Sheet 7 and Drawing LBP-4) o Computer Rooms 205 - 206 (Scope Sheet 8 and 9, and Drawing LBP-4) o Toilet Room 204T and 208 T (Scope Sheet 10 and Drawing LBP-4) o Stairwell 2-A (Scope Sheet 11 and Drawing LBP-4) o Stairwell 2-C (Scope Sheet 12 and Drawing LBP-4) o Gymnasium 420 (Scope Sheet 13 and Drawing LBP-5) o Stairwell 521S (Scope Sheet 14 and Drawing LBP-6) Third Floor o Classroom 301, Classroom Storage 301A (Scope Sheet 15 and 16, and Drawing LBP-7) o Classrooms 303 - 308 (Scope Sheet 17 - 21, and Drawing LBP-7)

Post-Bid

Educational

$750,000.00

Public - City

Renovation

16

17

35

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Lead Remediation
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork, Wood Paneling
Division 08 - Openings

Division 08 - Openings

Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Special Exhaust Systems, Sawdust Collection Systems

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
141
Bidding Soon
2,112
All Active Projects
1,015
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Richards HS - LBP Mitigation And Surface Stabilization_Various Areas

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.