Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, new construction, renovation and addition to an educational facility in Rocklin, California. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
Student Union Modernization and Expansion Project. GENERAL INFORMATION: This project will modernize and expand the existing 60 year-old Student Union Facility at the District's Rocklin campus. The scope of the project will include modernization and renovation of the existing Building J - Student Union (approximately 27,000 gsf ) and the existing Building K - Bookstore (approximately 10,000 gsf) along with some expansion and infill of existing covered areas. The project will include replacement of mechanical, electrical and plumbing systems, seismic retrofit, glazing and storefront replacement, exterior skin replacement and reroofing along with substantial modernization of the sitework adjacent to the buildings. The project will not include any work in the Kitchen in Building J, which was recently remodeled. The construction cost estimate of the project is $27,600,000 with a construction duration of approximately 18 months. The project delivery method will be design-bid-build. Refer to attached site plan for reference, attached hereto as Attachment 1. The project is being funded by the Measure E bond Deadline to submit questions 5/14/2024 at 3:00 pm Site Walk Meeting. A Mandatory Site Walk Meeting will be held at 10:00 AM on 6/4/2024. Additional details will be provided to Finalists with the Scope of Project document. Each Finalist may bring up to four attendees. Attendance will be taken at the beginning of the meeting. Failure to attend, tardiness or leaving the meeting early will render the Firm ineligible to interview for the Project. The purpose of this meeting is to allow the Finalists to see the facility and ask questions regarding the scope of the project.
Award
Educational
$27,600,000.00
Public - County
Addition, Demolition, New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2024
July 22, 2024
5100 Sierra College Blvd, Rocklin, CA
Related To This Project
Rocklin, CA
Bid Date: Apr 30 2024
Rocklin, CA
Bid Date: Jul 21 2020
Rocklin, CA
Bid Date: Jun 06 2024
Rocklin, CA
--
Rocklin, CA
--
Rocklin, CA
--
Rocklin, CA
--
Rocklin, CA
--
Rocklin, CA
Bid Date: May 02 2024
Rocklin, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.