BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Coral Gables, Florida. Completed plans call for the renovation of a 3,036-square-foot, one-story above grade military facility.

JR1127632, 12639524R0020, 22-0063, 12639521D0050 Amendment 0002 is posted below. It extends the date that offers are due to match the date (June 10) in General Information above. Project: Building 62 Laboratory and Office Space Rehabilitation 2.0 Location: U.S. Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS), Plant Protection Quarantine (PPQ), Center for Plant, Health, Science and Technology (CPHST), 13601 Old Cutler Rd, Coral Gables, FL 33158 3.0 Background: Currently, PPQ's Science &Technology (S&T) Treatment and Inspection Methods Laboratory (TIML) occupies laboratory space in the Agriculture Research Service's (ARS) Subtropical Horticultural Research Station in Miami, FL, through a revocable permit issued in July 2020. ARS informed APHIS that they (ARS) were increasing staffing levels. Thus, PPQ would need to vacate the space currently used as a chemistry lab in Building 89. ARS identified potential replacement space for PPQ's use in Building 62. Building 62 is a single-story building that was constructed in the 1960s. The building is approximately 3,046 SF and is roughly 60 years old. Building 62 previously housed staff offices and laboratories but was later abandoned by ARS. The building has been vacant for more than 10 years and requires extensive renovations to make it habitable and operationally viable for TIML's functions. All mechanical, electrical, and plumbing systems have been abandoned and/or removed. Thus, the building needs a complete overhaul to become code compliant. Renovation of Building 62 will provide office and laboratory space for five or six scientists. A lead and asbestos survey were conducted on July 19, 2017, by Durbin Environmental to identify any asbestos containing materials (ACM) or lead paint that needed abatement. Building 62 was found to have some ACM. The Contractor shall begin performance within 10 calendar days and complete it within 365 calendar days after receiving *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated magnitude of this project is between $1 million and $5 million. PN - 9930

Award

Military

$1,829,768.00

Public - Federal

Renovation

56

32

8

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
112
Bidding Soon
1,686
All Active Projects
712
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 14, 2024

August 15, 2024

August 14, 2025

img_map_placeholder

13601 Old Cutler Rd, Coral Gables, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.