BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Miami, Florida. Completed plans call for site work for a playground / park / athletic field.

*As of July 08, 2024, the award amount is $2,331,130.68. (Contractor must obtain and submit all permits prior to performing any work.) CONTRACTOR shall review all documents, specifications, plans and scope of work provided by Miami-Dade County Parks, Recreation, and Open Spaces Department for work to be completed. Furnish all labor, equipment, and materials required to comply with the intent of the WORK described in the contract documents including but not limited to the installation of two (2) cantelevered canopy structures with canopy shade fabric over two (2) existing metal bleachers located along each sideline of the football field at Gwen Cherry Park. Each cantelivered canopy structure is approximately 180 feet long, 38 feet wide and 35 feet tall, and each contains nearly 7,000 square feet of fabric. Provide and install new electrical service, new lighting and photometrics. Provide and install new addressable fire alarm system and connect to existing system. Work also includes modification and repairs to the existing 8-foot-high chain link fence. If you have any questions, contact Hugo Urizar at 305-755-7992. Project Location: Gwen Cherry Park - 7090 NW 22nd Avenue, Miami, FL 33147 All Requests for Information (RFI) Must Be Submitted Electronically, in Word Format, by 05/09/2024 to Penelope.quintas@miamidade.gov and a Copy Filed With the Clerk of the Board at Clerkbcc@miamidade.gov No Phone Calls Will Be Accepted. Liquidated Damages: YES $$ Per Day: $250.00 Scope of Work The information presented in this HASP is based on the best available information at the time of the HASP preparation and is intended only for activities described in this plan. The scope-of-work is summarized below: Complete underground utility clearance through Sunshine 811 and private utility clearance (GPR Survey), mobilize to site and complete the installation of the shade canopies over the bleachers along the football field. During all soil excavation, drilling, stockpiling, and loading into trucks for off-site disposal, the soils will be kept moist to minimize dust. Barricades with yellow caution tape will be placed around the excavation, stockpiled soils, and soil loadings areas. Based on contaminants of concern detected over the course of several previous assessments, in addition to this HASP, CEI proposes a Soil Management Plan/Air Monitoring Plan (SMP/AMP) for the earth work activities. Daily air monitoring will be provided during the earth work activities. Refer to Attachment D for a copy of the SMP/AMP.

Award

Playgrounds / Parks / Athletic Fields

$2,331,131.00

Public - County

Site Work

25

19

9

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
45
Bidding Soon
1,090
All Active Projects
483
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.