BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Siren, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

.This is a LRIP-TRIP project. Bids will be discussed with possible approval at the regular June Town Board meeting. PROJECT DESCRIPTION o Furnish and install approximately 2900 tons of WisDOT 4 LT 58-34 S Hot Mix Asphaltic Pavement on approximately 1.7 miles of Elbow Lake Rd.(CTH W to Shuttleworth Rd.) Includes intersection of Shuttleworth Rd. The pavement shall be 20 feet wide, 2.5 inch compacted thickness and a 2% cross slope. The contractor will be required to pass a proof roll of aggregate surface with owner present to assure parties of compaction. o All work shall be completed no later than October 1, 2024. The work schedule will be mutually agreed to by the Town of Daniels and the successful bidder. Item No. Description Units Quantity Unit Price 460.1100 HMA PAVEMENT, 4 LT 58-34S TONS 2900 The Bidder's unit price bid shall include all costs associated with producing, hauling, and placing the material including, but not limited to, mobilizing and demobilizing labor and equipment required to produce, haul, and place the material; costs of quality control testing and reporting; costs to produce the material to the specifications; traffic control; costs of permitting, licensing, and reporting as required; all overhead, profit and administrative costs; and any other incidental items required for the work as specified. Paving contractor's price will also include final shaping and compaction of the aggregate base and will be verified by string line method with the owner present. The work shall be completed in accordance with the latest edition of the Wisconsin Department of Transportation Standard Specifications for Road and Bridge Construction, Part 1 and applicable sections of Part 4. An engineer's certification will be required certifying the completed work meets DOT specifications with a 10-year design life. Contractor will be required to provide certified scale tickets for material delivered to the project. The Town of Daniels reserves the right to reject any and all bids and to waive any informality in the bidding process or accepting bids which best serves the interest of the Town.

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
28
Bidding Soon
779
All Active Projects
352
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

June 14, 2024

img_map_placeholder

Elbow Lake Rd, Siren, WI

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.