BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in San Simeon, California. Completed plans call for site work for a playground / park / athletic field.

DPR will provide an individual electronic email response confirming receipt of each submission received. If a confirmation receipt is not received within 30- minutes of submission, please contract Merrilee Byrnes at Merrilee.Byrnes@parks.ca.gov to confirm your bid was received. Confirmation receipt is not a representation by DPR that the submitted bid is responsive and complete. Bidders shall ensure that the electronic submission contains the attachment, the documents are fully responsive and lack any deficiency and is directed to the appropriate email address (DPR.PWBIDS@parks.ca.gov) without error. Failure to do so risks the bid being deemed unresponsive. It is recommended that Bidders submit bids at least an hour in advance of the bid submission deadline to allow for confirmation of bid submission. Bids will be submitted for performing the work as follows: Furnish all labor, materials, tools and equipment necessary to rehabilitate the San Simeon Pier. Project consists of pile removal and installation, decking and railing removal and installation, stringer and bracing installation as necessary, water line installation, and regulatory permit compliance at Hearst San Simeon State Park in San Luis Obispo County, California, complete and in accordance with the plans and specifications therefore and such addenda thereto as may be issued prior to bid opening date. License required: A and/or B Engineer's Estimate: $5,000,000 to $6,000,000 Contract Term: 547 Calendar Days from Notice to Proceed Contract Performance Period: 182 Calendar Days from Formal Start Work Date Physical Work onsite is to be performed between September and May. The Contractor may be issued the Notice to Proceed (NTP) for the project prior to this date. The period between the NTP and Start Work Date can be used for administrative tasks (such as Submittals, RFI's, etc.) and is included in the overall Project Duration. The bidder agrees to complete all work within ONE HUNDRED EIGHTY-TWO (182) calendar days from the date of written notice to commence work. This time includes ten (10) calendar days allowed for the contractor to begin work. Question Deadline 05/23/2024 at 2:00 PM PT. Any discrepancies, omissions, ambiguities, or conflicts in or among the contract documents or doubts as to meaning shall be brought to the State's attention by including your comments directly to Merrilee.Byrnes@parks.ca.gov. Answers will be provided by Addendum which will be posted electronically. It is the responsibility of the bidders to Obtain any addenda as needed. No bid will be considered unless it is made on a standard bid form furnished by the Department of Parks and Recreation, and is made in accordance with the "Instructions to Bidders". Bids must be submitted for the entire work as described herein. The Department of Parks and Recreation reserves the right to waive any irregularity in a bid or to reject any or all bids. The apparent low bidder will be required to execute a contractual agreement in the form of a "Standard Agreement - Form 213" which shall be binding upon the State of California only upon approval by the State. Bond requirements for contracts exceeding $5,000 are stated in the General Conditions, DPR 483, Section 000700. In accordance with the provisions of Section 1770, 1773 and 1773.1 of the Labor Code, the Department has ascertained that the general prevailing rate of wages in the county in which the work to be done be as listed by the Department of Industrial Relations (415) 703-4780. A copy of this listing is on file at the address Bids exceeding $5,000 shall have enclosed cash, a cashier's check, certified check, or a bidder's bond, executed as surety by a corporation authorized to issue surety bonds in the State of California, made payable to "Director of Parks and Recreation," in an amount equal to at least 10 percent of amount of bid. No such bid shall be considered unless one of the forms of bidder's security is enclosed therewith. If bidder's security is a bidder's bond, it must be executed on a form approved by the state. Personal checks are not acceptable. When the Contract Sum exceeds five thousand dollars ($5,000), Contractor shall furnish, in duplicate, a Payment Bond, to accompany the Contract, in an amount equal to one hundred percent (100%) of the Contract Sum securing payment for laborers, mechanics, and material suppliers used on the Work under the Contract. Payment Bonds shall be prepared on a Payment Bond to Accompany Construction Contract (STD. 807) as furnished by State. When the Contract Sum exceeds five thousand dollars ($5,000), Contractor shall furnish, in duplicate, a Performance Bond, to accompany the Contract, in the amount equal to at least one hundred percent (100%) of the Contract Sum guaranteeing faithful performance of the Work. Performance Bonds may be prepared on standard bonding company forms. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Playgrounds / Parks / Athletic Fields

$3,185,000.00

Public - State/Provincial

Site Work

17

13

14

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
13
Bidding Soon
169
All Active Projects
70
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

July 29, 2024

img_map_placeholder

750 Hearst Castle Rd, San Simeon, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.