BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Las Vegas, Nevada. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of September 24.2024 this project has not yet been awarded. A timeline for the award has not yet been established.** Clark County invites qualified firms or individuals to submit bids. Question Deadline 07/18/2024 at 5:00 PM PT. Questions regarding this bid must be directed to the Bid Contact Scott Basquiat-Jones, scott.jones@clarkcountynv.gov The work to be performed for this project consists of roadway improvements to the interchange of Clark County 215 Beltway & Summerlin Parkway. Roadway improvements include, reconfiguration of interchange ramps and the construction of new ramps, four new roadway bridges, and widening the existing Summerlin Parkway bridge, three new trail bridges for the City of Las Vegas Trail, retaining walls, storm drainage facilities, curbs, gutters, sidewalks, streetlighting, traffic signals modifications, utility modifications and relocations, traffic control devices/signage, and pavement markings, and other related items of work. ESTIMATED COST: $138,220,352 - $152,769,862.

Award

Roads / Highways

$130,000,000.00

Public - County

Paving, Site Work

755

10

162

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
41
Bidding Soon
621
All Active Projects
302
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

September 23, 2024

img_map_placeholder

Clark County 215 Beltway & Summerlin Parkway, Las Vegas, NV


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.