BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Simi Valley, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Pursuant to statute and to the authorization approved by the City of Simi Valley, California, and on file in the office of the City Clerk of said City, Notice is hereby given that sealed bids for FY 2024-25 Annual Major Streets Rehabilitation Program: Fitzgerald Road (First Street to Erringer Road and Sycamore Drive To Appleton Road). No contractor or subcontractor may be listed on a bid proposal for a public works project submitted on or after March 1, 2015, unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5, or unless the contractor or subcontractor qualifies for an exception from this requirement, for bid purposes only, as set forth in Labor Code section 1771.1(a). If contractor or subcontractor believes that such an exception in 1771.1(a) applies, it must provide the applicable exception(s) in its bid proposal. Even those contractors or subcontractors who qualify for an exception under 1771.1(a) must be registered with DIR at the time of award, if such award is made on or after April 1, 2015. No contractor or subcontractor may be awarded a contract for public work on a public works project awarded on or after April 1, 2015 unless registered with DIR pursuant to Labor Code section 1725.5, unless the small project exemption applies. This project is subject to compliance monitoring and enforcement by the DIR. Scope of work: The Major Street Rehabilitation Program will consist of: 1) construction surveying; 2) 377,000 S.F. of 2 1/2 " asphalt pavement cold milling; 3)70 L.F. of root pruning and installation of root barrier; 4) two (2) trees removal; 5) 15,200 S.F. of 6" asphalt pavement cold milling; 6) sawcut, removal, and reconstruction of 1,249 S.F. of sidewalk; 7) 124 L.F. of concrete sidewalk grinding; 8) 12 sawcut, removal, and reconstruction of curb ramps; 9) sawcut, removal, and installation of five (5) cast-in-place truncated domes; 10) 980 S.F. sawcut, removal, and reconstruction of existing cross gutter; 11) placement of 6,200 tons of rubberized asphalt concrete; 12) placement of 340 tons of base course; 13) traffic signing and pavement delineation; 14) 20 sewer manhole frames, rings and covers replacement; 15) 44 water valve assembly replacement; 16) seven (7) storm drain manhole lower and adjust to grade; 17) adjustment of three (3) survey monuments to grade; and all appurtenant work. The expected completion time is 40 consecutive working days after receipt of the Notice to Proceed. The Proposal shall be submitted and the work shall be performed by a State of California Class A licensed contractor in strict conformance with Specification No. SV 24-24, and now on file in the City's Department of Public Works and the Office of the City Clerk. It is the bidder's responsibility to check online for any addenda that may be issued for this project prior to submittal of the bid. Failure to submit required addenda with the bid disqualifies the bidder. All questions concerning the bid document should be directed to the Associate Engineer/Capital Projects, Department of Public Works, at (805) 583-6882. All prospective bidders shall abide by the provisions of the Bid Terms and Conditions listed in the project's specifications. The City reserves the right to retain all proposals for a period of 60 days after the bid opening date for examination and comparison and to delete any portion of the work from the Contract. The City reserves the right to determine and waive non substantial irregularities in any proposal, to reject any or all proposals, to reject one part of a proposal and accept the other. The bid shall be balanced so that each bid item is priced to carry its share of the cost of the work and also its share of the contractor's overhead and profit. The City reserves the right to delete any bid item to the extent that the bid is qualified by specific limitation. An unbalanced bid shall be considered as grounds for rejecting the entire bid. The City further reserves the right to make award to the lowest responsive and responsible bidder as the interest of the City may require. In accordance with the provisions of Division 2, Part 7, Chapter 1 of the California Labor Code, the California Department of Industrial Relations has established the general prevailing rates of per diem wages for each craft, classification, and type of work needed to execute contracts for public works and improvements. The per diem wages published at the date the Contract is advertised for bids shall be applicable. Copies of the prevailing rate of per diem wages are on file at the California Department of Industrial Relations and are available to any interested party at www.dir.ca.gov/DLSR/PWD/index.htm. Future effective wage rates, which have been predetermined, are on file with the Department of Industrial Relations, and are referenced but not printed in said publication. The new wage rates shall become effective on the day following the expiration date and apply to this Contract in the same manner as if they had been included or referenced in this Contract. The contractor may substitute securities for retention monies pursuant to Public Contract Code Section 22300 The Major Street Rehabilitation Program will consist of: 1) construction surveying; 2) 377,000 S.F. of 1/2 %" asphalt pavement cold milling; 3) 70 L.F. of root pruning and installation of root barrier; 4) two (2) trees removal; 5) 15,200 S.F..of 6" asphalt pavement cold milling; 6) sawcut, removal, and reconstruction of 1,249 S.F. of sidewalk; 7) 124 L.F. of concrete sidewalk grinding; 8) 12 sawcut, removal, and reconstruction of curb ramps; 9) sawcut, removal, and installation of five (5) cast-in-place truncated domes; 10) 980 S.F. sawcut, removal, and reconstruction of existing cross gutter; 11) placement of 6,200 tons of rubberized asphalt concrete; 12) placement of 340 tons of base course; 13) traffic signing and pavement delineation; 14) 20 sewer manhole frames, rings and covers replacement; 15) 44 water valve assembly replacement; 16) seven (7) storm drain manhole lower and adjust to grade; 17) adjustment of three (3) survey monuments to grade; and all appurtenant work. The expected completion time is 40 consecutive working days after receipt of the Notice to Proceed The Contractor will furnish all of the labor; supplies and materials; equipment; printing; vehicles; transportation; office space and facilities; all tests, testing and analyses; and all matters whatsoever (except as otherwise expressly specified to be furnished by the City) needed to perform and complete the Work and provide the services required of the Contractor by the Contract Documents. If you discover any error or omission in the plans, specifications, or proposal, or have any question concerning the bidding documents, please contact: Lauren Lien Associate Engineer, Capital Projects Department of Public Works 2929 Tapo Canyon Road Simi Valley, CA 93063 Telephone (805) 583-6882 llien@simivalley.org A complete copy of the Bid Specification can be viewed and downloaded from the City's website, www.simivalley.org. Bids & Proposals section under the For Business Tab. Advise the person answering the phone that you have a "Bidding Question." Please do not call other staff members or consultants.

Award

Roads / Highways

$1,919,152.00

Public - City

Paving, Site Work

10

11

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
202
Bidding Soon
3,188
All Active Projects
1,354
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 21, 2024

July 22, 2024

September 16, 2024

img_map_placeholder

Multiple Locations, Simi Valley, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.