EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 17, 2024 at 8:00 PM

Updated May 18, 2024

Site work and paving for a mixed-use development in Aurora, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work generally consists of crack routing, crack filling, sealcoating, and pavement markings for asphalt parking lots, court surfaces, asphalt sidewalks, and trails. The project is located at various locations in the Fox Valley Park District in Aurora, North Aurora, and Batavia, IL. A location map and summary of quantities is included with these documents. The Contractor shall work between June 11, 2024, and August 30, 2024. The Contractor shall complete all contract items, and safely open all roadways to traffic by 11:59 PM on August 30, 2024. The amount of the check is five percent (5%) of the contract amount, or $10,000, whichever is greater

Bid Results

Roads / Highways

$168,067.00

Public - City

Paving, Site Work

3

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
117
Bidding Soon
1,965
All Active Projects
717
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

June 11, 2024

img_map_placeholder

Multiple Locations, Aurora, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.