BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Fort Leonard Wood, Missouri. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

https://houstonherald.com/2024/08/fort-wood-airport-receives-1-3m-for-new-terminal/ Fort Wood airport receives $1.3M for new terminal An airport in south-central Missouri will receive about $1.3 million to construct a new terminal building. The project is at Waynesville-St. Robert Regional Forney Field at Fort Leonard Wood, the Federal Aviation Administration (FAA) announced. _________________________________ Furnishing All Labor, Materials, Equipment and Performing All Work Necessary to Do the Complete the Project Titled: Construct New TBN Terminal at Waynesville - St. Robert Regional Airport. A site visit of the existing terminal building and associated greenfield construction site will be held after the prebid conference concludes. Question Deadline 05/18/2024. Questions regarding bids shall be directed to Robert Osborne, Project Manager at Burns & McDonnell at rosborne@burnsmcd.com or by calling (737) 787 - 6690. Technical questions and requests for clarifications shall be submitted in writing (traditional mail or email) to the Project Manager, Robert Osborne, no later than 5 calendar days prior to the Bid Opening Date. Questions and clarifications shall be submitted to: Burns & McDonnell Engineering Company, Inc., 9400 Ward Parkway, Kansas City, Missouri 64114, by telephone at 816-337-0824, and/or via email at rosborne@burnsmcd.com. The geotechnical report completed for the project is available upon request. Requests shall be sent to Robert Osborne at rosborne@burnsmcd.com. The overall contract time for this project is 385 calendar days, with 90 of those days being allotted to Phase 1, and the balance of days (295 days) allotted to phase 2. Runway 15-33 will remain open for the duration of the project along with Taxiway A north of the military ramp, Taxiway B, Taxiway C, Taxiway C1 and Taxiway C2. Taxiway A south of the Extended Military Ramp will be closed during Phase 1B as shown in Appendix A. The project will be constructed under one Base Bid. Description of Project: This project will construct a new greenfield airport terminal for the cities of Waynesville and St. Robert. B. Work Covered by Contract Documents: Tasks included as part of this project include but are not limited to: 1. Entrance Road Construction 2. Parking Lot Construction 3. Terminal Building Construction a. Karst Mitigation will be performed at this site. b. TSA screening equipment will be relocated from the existing terminal to this new terminal.

Post-Bid

Transportation Terminals

$1,500,000.00

Public - City

New Construction, Site Work

251

41

325

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
52
Bidding Soon
687
All Active Projects
300
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 11, 2024

August 12, 2024

August 25, 2025

img_map_placeholder

5017 Iowa Ave, Fort Leonard Wood, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.