Site work and paving for a mixed-use development in Magnolia, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work includes construction of one (1) gravel packed well with foundation; one (1) bolted steel ground storage tank with foundation; one (1) hydropneumatic tank including foundation; three (3) horizontal split case booster pumps with foundations; install one (1) diesel generator with sound attenuated enclosure and ATS (provided by others), install 24-hour subbase fuel tank (provided by others), and construct the foundation; pre-engineered canopy; two (2) fiberglass reinforced plastic chemical feed buildings with foundation; disinfection equipment with chemical injection lines; plant piping; electrical, instruments, and control work including service; protective coatings; concrete pavement, driveway and sidewalks; wood fence and gate; grading, and drainage swales; hydro-mulch seeding; and all additional items shown on the construction plans or needed for a completely functional water plant and water well. The Work. Bids are invited on a general contract for the construction of the Two Step Farm Water PlantNo. 1 - Phase I for JEN Texas 35, LLC on behalf of Montgomery County Municipal Utility District No. 123. Estimate: $6,755,000 Question Deadline 05/14/2024 at 10:00 AM CT The Owner reserves the right to reject any or all bids and waive any or all irregularities. The project must be substantially complete within 330 calendar days . Final completion must be within 90 calendar days from the date of substantial completion.. By February 25, 2025, the Contractor shall provide the Engineer with the interim well approval documents for the TCEQ. The interim well approval documents for the TCEQ shall include the cementing certificate, state of Texas well report, driller's log, material settings, results of 36-hour pump test, chemical analyses, three passing bacteriological samples from the well, and all other documents required by the TCEQ for interim well approval. All the work necessary to provide these items, including completion of the well, disinfection, temporary or permanent power supply, and accessories to provide the bacteriological samples, shall be completed by February 25, 2025.

Post-Bid

Roads / Highways

$6,755,000.00

Public - County

Paving, Site Work

66

22

8

6

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
334
Active Projects
215
Bidding Soon
4,184
All Active Projects
1,681
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 17, 2024

July 16, 2024

February 25, 2025

img_map_placeholder

FM 1488 & Honea Egypt Rd, Magnolia, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.