Site work, paving and new construction of a mixed-use development in Santa Rosa, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; playground / park / athletic field; for the construction of a playground / park / athletic field; warehouse / distribution facility; and sidewalk / parking lot.
The Kawana Springs Community Park Garden, located at Kawana Springs Road and Amethyst Way, encompasses approximately 1.08 acres and will have a semi-circle drive with an ADA parking space and two additional parking spaces. Also included in the design is an ADA compliant raised garden bed, two shaded picnic tables & concealed porta-potty. There will be two storage sheds provided as well as shade trees and landscaping ou tside the gardens. There are accessible paths to the gardens as well as a new pedestrian crossing for Kawana Springs Rd. Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to City via the PlanetBids portal.Oral responses are not authorized and are not binding on the City. Bidders should submit any such written inquiries at least five Working Days before the scheduled bid opening. Questions received any later might not be addressed before the bid deadline. An interpretation or clarification by City in response to a written inquiry will be issued in an addendum. Liquidated Damages. As further specified in Section 5.4 of the General Conditions, if Contractor fails to complete the Work within the Contract Time, City will assess liquidated damages in the amount of $1,500 per day for each day of unexcused delay in achieving Final Completion, and such liquidated damages may be deducted from City's payments due or to become due to Contractor under this Contract. Bid Bond 10.00% ; Payment Bond 100.00% ; Performance Bond 100.00 Time for Final Completion. The Project must be fully completed within 90 Working Days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about May 1st, 2026, but the anticipated start date is provided solely for convenience and is neither certain nor binding The Project is located south of the Kawana Springs Road and Amethyst Way intersection and is described as follows: The Community Garden will include an asphalt concrete driveway, three parking spaces a new pedestrian crossing with solar powered flashing beacons, and a new ADA curb ramp will be installed at the Kawana Springs Road and Amethyst Way intersection. Additionally, a new concrete pathway will be constructed east of the Community Garden location connecting the garden to the existing curb ramp located at Meda Avenue which is also planned to be updated to a directional ramp. A new irrigation water line will be installed and is planned to connect to the existing water line located within Kawana Springs Road. Associated construction will include but is not limited to a new irrigation water line located within Kawana Springs Road, an ADA compliant raised garden bed, two shaded picnic tables, a concealed porta-potty, and two storage sheds.
Award
Sidewalks / Parking Lot
$1,568,283.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2025
May 1, 2026
1350 Kawana Springs Rd, Santa Rosa, CA
Related To This Project
Santa Rosa, CA
Bid Date: Jun 27 2024
Santa Rosa, CA
Bid Date: Jan 07 2025
Santa Rosa, CA
--
Santa Rosa, CA
Bid Date: Mar 11 2025
Santa Rosa, CA
Bid Date: May 20 2024
Santa Rosa, CA
Bid Date: Jun 06 2024
Santa Rosa, CA
Bid Date: Jun 05 2024
Santa Rosa, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.