BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Cascade, Idaho. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1240LT24Q0045, 670152, 1124803 Received questions are answered and posted via this update. The response date and time remains the same. A. This project consists of crack sealing, patching asphalt, and chip sealing approximately 4.65 miles of the roadway. B. Quantities associated with this work are included in the Schedule of Items and in the project plans. C. All work shall be in compliance with the contract documents. The contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies. Work includes but is not limited to: crack sealing for alligator cracking, longitudinal/transverse cracks, patching potholes, depressions, and rutting, and placing a 1/2 " chipseal. All work will be in accordance with FP-14 and supplemental project specifications. Contractor is responsible for providing 3rd party inspection and testing for all aspects of chipseal work. D. Allowed road closures and disruptions are included in the Forest Service Supplemental Specifications (FSSS) (Section 156 Public Traffic). Questions shall be emailed to tony.taylor@usda.gov. Questions are due by 12:00 noon (MT) on June 6, 2024. Answers are expected to be provided within 3 business days after the deadline. Questions received after the deadline may not be addressed E. The Contracting Officers Representative (COR) will designate staging areas along the construction site. Limited camping for project personnel will be allowed at the site with permission of the COR. Staging of materials for the project will be allowed in designated areas inside the project boundary if approved in writing by the COR at the time of the project implementation. o Depending on the snow and seasonal temperatures, the site is commonly accessible between May 15th and October 30th of most years. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Goals for minority participation for each trade 4.4% Goals for female participation for each trade 6.9%

Award

Roads / Highways

$703,609.00

Public - Federal

Paving, Site Work

5

9

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
5
Bidding Soon
179
All Active Projects
60
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 1, 2024

img_map_placeholder

Sage Hen Reservoir Rd, Cascade, ID

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.