BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tonasket, Washington. Completed plans call for site work for a water / sewer project.

Any contract let from this RFP shall be in effect upon the date of award and shall continue to be in effect until the termination of the Contract. It is anticipated that the Project should be completed between August 1st 2024, and October 31st, 2024. Question Deadline 05/06/2024 at 3:00 PM PT Requests for interpretation/clarification of this RFP must be emailed to John Box at John.Box.FNW@colvilletribes.com. Unauthorized contact with other tribal employees or by any method than by email regarding this RFP may result in disqualification. Questions submitted by any method other than email may result in disqualification. All oral communications will be considered unofficial and non-binding on the Tribes. The winning contractor will be responsible for all aspects of project construction as described in the included design package. The winning contractor must have GPS machine control on at least two excavators and one bulldozer. The following list of key project actions is provided to aid in project understanding. Set erosion control and stormwater management. Access road improvement and ongoing maintenance. Establish staging areas. Work area isolation for instream work. Coordinate, purchase and deliver to the site a 32'wide bottomless arch culvert with precast spread footings. Assemble and install bottomless arch culvert. Install appropriate water bypass system to divert the entirety of the stream for in water work. Expected stream flow is <5 cfs. Construct ~30 Beaver Dam Analogues. Transport logs from 3 onsite staging areas to final placed locations. Install 3" untreated posts and tree tops for floodplain roughness and post assisted log jams. Repair all barb wire fence crossings. Decompact soils. Repair impacted access roads that are used by the public. Prepare areas with disturbed soils for planting. Continuous dust abatement during the entire construction period. The attached design package is a draft final plan set. No major changes are expected in the final design package. The final design package and specification sheet will be available to the selected contractor before the contract is signed. The CTCR reserves the right to reject any and all proposals, whether or not within applicable cost limits, and to waive any information in the proposals received, whenever such rejection or waiver is in the best interest of the CTCR. In the event of disagreement or grievances regarding contract, it is the CTCR policy to resolve all contractual issues per adopted Procurement Policy. The method of Contractor Selection has not been Determined at this time The winning contractor will be responsible for all aspects of project construction as described in the included design package. The winning contractor must have GPS machine control on at least two excavators and one bulldozer. The following list of key project actions is provided to aid in project understanding. Set erosion control and stormwater management. Access road improvement and ongoing maintenance. Establish staging areas. Work area isolation for instream work. Coordinate, purchase and deliver to the site a 32'wide bottomless arch culvert with precast spread footings. Assemble and install bottomless arch culvert. Install appropriate water bypasssystem to divert the entirety of the stream for in water work. Expected stream flow is <5 cfs. Construct ~30 Beaver Dam Analogues. Transport logs from 3 onsite staging areas to final placed locations. Install 3" untreated posts and tree tops for floodplain roughness and post assisted log jams. Repair all barb wire fence crossings. Decompact soils. Repair impacted access roads that are used by the public. Prepare areas with disturbed soils for planting. Continuous dust abatement during the entire construction period.

Post-Bid

Water / Sewer

$500,000.00

Public - Federal

Site Work

31

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
8
Bidding Soon
65
All Active Projects
33
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2024

August 1, 2024

img_map_placeholder

Whiskey Creek Rd and Havillah Rd, Tonasket, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.