Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Tonasket, Washington. Completed plans call for site work for a water / sewer project.
Any contract let from this RFP shall be in effect upon the date of award and shall continue to be in effect until the termination of the Contract. It is anticipated that the Project should be completed between August 1st 2024, and October 31st, 2024. Question Deadline 05/06/2024 at 3:00 PM PT Requests for interpretation/clarification of this RFP must be emailed to John Box at John.Box.FNW@colvilletribes.com. Unauthorized contact with other tribal employees or by any method than by email regarding this RFP may result in disqualification. Questions submitted by any method other than email may result in disqualification. All oral communications will be considered unofficial and non-binding on the Tribes. The winning contractor will be responsible for all aspects of project construction as described in the included design package. The winning contractor must have GPS machine control on at least two excavators and one bulldozer. The following list of key project actions is provided to aid in project understanding. Set erosion control and stormwater management. Access road improvement and ongoing maintenance. Establish staging areas. Work area isolation for instream work. Coordinate, purchase and deliver to the site a 32'wide bottomless arch culvert with precast spread footings. Assemble and install bottomless arch culvert. Install appropriate water bypass system to divert the entirety of the stream for in water work. Expected stream flow is <5 cfs. Construct ~30 Beaver Dam Analogues. Transport logs from 3 onsite staging areas to final placed locations. Install 3" untreated posts and tree tops for floodplain roughness and post assisted log jams. Repair all barb wire fence crossings. Decompact soils. Repair impacted access roads that are used by the public. Prepare areas with disturbed soils for planting. Continuous dust abatement during the entire construction period. The attached design package is a draft final plan set. No major changes are expected in the final design package. The final design package and specification sheet will be available to the selected contractor before the contract is signed. The CTCR reserves the right to reject any and all proposals, whether or not within applicable cost limits, and to waive any information in the proposals received, whenever such rejection or waiver is in the best interest of the CTCR. In the event of disagreement or grievances regarding contract, it is the CTCR policy to resolve all contractual issues per adopted Procurement Policy. The method of Contractor Selection has not been Determined at this time The winning contractor will be responsible for all aspects of project construction as described in the included design package. The winning contractor must have GPS machine control on at least two excavators and one bulldozer. The following list of key project actions is provided to aid in project understanding. Set erosion control and stormwater management. Access road improvement and ongoing maintenance. Establish staging areas. Work area isolation for instream work. Coordinate, purchase and deliver to the site a 32'wide bottomless arch culvert with precast spread footings. Assemble and install bottomless arch culvert. Install appropriate water bypasssystem to divert the entirety of the stream for in water work. Expected stream flow is <5 cfs. Construct ~30 Beaver Dam Analogues. Transport logs from 3 onsite staging areas to final placed locations. Install 3" untreated posts and tree tops for floodplain roughness and post assisted log jams. Repair all barb wire fence crossings. Decompact soils. Repair impacted access roads that are used by the public. Prepare areas with disturbed soils for planting. Continuous dust abatement during the entire construction period.
Post-Bid
Water / Sewer
$500,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2024
August 1, 2024
Whiskey Creek Rd and Havillah Rd, Tonasket, WA
Related To This Project
Tonasket, WA
Bid Date: Jul 08 2024
Tonasket, WA
--
Tonasket, WA
Bid Date: Sep 25 2024
Tonasket, WA
Bid Date: Oct 03 2024
Tonasket, WA
--
Tonasket, WA
Bid Date: Nov 28 2023
Tonasket, WA
Bid Date: Mar 16 2023
Tonasket, WA
--
Tonasket, WA
--
Tonasket, WA
Bid Date: Jul 27 2023
Tonasket, WA
--
Tonasket, WA
--
Tonasket, WA
--
Tonasket, WA
Bid Date: Feb 14 2023
Tonasket, WA
Bid Date: Mar 23 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.