Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 29, 2024 at 8:00 PM
Updated October 1, 2024
This is a service / maintenance or supply contract in Waurika, Oklahoma. Contact the soliciting agency for additional information.
The successful contractor, as an option, may receive advance payment by providing statutory and performance bonds found in Optional Statutory and Performance Bond Required for Successful Contractor Advance Payment. Inclusion of these bonds is optional and submission is not necessary to constitute a "responsive bid." Funding for this project is provided through American Rescue Plan Act (ARPA) grant program. As such, compliance with Labor Standards Contract Provisions is mandatory. Compliance with the Davis Bacon Act is mandatory if the total project cost exceeds $10,000,000 (ten million dollars). All quotes received at said time will be opened and evaluated for completeness and correctness. All materials furnished shall be in accordance with the Specifications prepared by Keithline Engineering Group, and on file in the office of Manager, Waurika Lake Master Conservancy District. The contract is to be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to correct any non-material clerical errors in the bidding as allowed under Oklahoma Law. The Owner reserves the right to reject any and all quotes in accordance with the Oklahoma Public Competitive Bidding Act of 1974. Conditional quotes shall not be accepted. Supplier shall provide four medium voltage power distribution centers with scada at three sites, meeting section 26-0591: 2.1.1 power distribution center "e-house" (design hp: 700hp), complete, f.O.B. Waurika intake pump structure nlt november 1, 2025 2.1.2 power distribution center "e-house" (design hp: 400hp), complete, f.O.B. Wlmcd intake & pump structure nlt november 1, 2025 2.1.3 power distribution center "e-house" (design hp:600hp), complete, f.O.B. Lawton relift station nlt october 1, 2025 2.1.4 power distribution center "e-house" (design hp: 200hp), complete, f.O.B. Duncan relift station nlt october 1, 2025 this purchase is part of a larger multi-contract, multi-site, interrelated set of projects with numerous connected components, varying equipment lead times, and varying schedules for completion. Refer to the specifications for specific requirements related to coordination between contracts, critical completion dates, outage duration limitations, and similar contractual requirements.
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Division 02 - Existing Conditions
Division 07 - Thermal and Moisture Protection
Division 09 - Finishes
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2024
June 17, 2024

Multiple Locations, Waurika, OK
Related To This Project
Waurika, OK
Bid Date: Jul 12 2024
Waurika, OK
Bid Date: Jul 12 2024
Waurika, OK
Bid Date: Aug 29 2024
Waurika, OK
Bid Date: Sep 12 2024
Waurika, OK
Bid Date: Sep 12 2024
Waurika, OK
Bid Date: Sep 12 2024
Waurika, OK
Bid Date: Sep 12 2024
Waurika, OK
Bid Date: Feb 20 2025
Waurika, OK
Bid Date: Apr 11 2024
Waurika, OK
Bid Date: Mar 26 2024
Waurika, OK
Bid Date: Nov 14 2024
Waurika, OK
Bid Date: Nov 03 2023
Waurika, OK
Bid Date: Dec 09 2021
Waurika, OK
Bid Date: Jan 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Four (4) Medium Voltage Power Distribution Centers - Provide and Deliver to Three (3) Sites
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.