BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Greenwood, South Carolina. Completed plans call for the renovation of a educational facility.

**As of June 5, 2024 project was awarded but awarded amount is not available.** Provide and Install Safety and Security Film. Description: Greenwood School District 50 , is seeking competitive bids from qualified vendors to provide supplies, equipment and services for the installation of Safety and Security Film at various locations within the District. Question Deadline 05/06/2024 at 1:00 PM ET Shealyn Barnes, (864) 941-5793, barness@gwd50.org The District's standard of safety and security film is manufactured by Suntek. The family of films includes Shatter resistance, IR-rejecting, solar control, Reflective films designed to be applied to interior window surfaces to hold broken glass together and reduce solar heat and ultraviolet light. Contractor must be a certified installer and dealer by Suntek before the bid due date. Contractor must comply with all installation requirements that Suntek requires. The District anticipates various needs throughout the term of the contract. The sq ft price will be used to price each project at the time of the need. It will be the responsibility of the contractor to inform the district if the film requested is not recommended for a particular application. The Director of Safety and Director of Maintenance will determine the work schedule and will coordinate between the contractor and the school principal. It Is the contractor's responsibility to dispose of all materials, clean up chemical spills, etc. at the end of each working date and upon completion of the project. All debris shall be removed from the job site and disposed of off-site. Contractor must follow all applicable regulations while on District property including no smoking, no weapons and drug-free policies. All permits required must be provided by the contractor. The contractor must supply any MSDS sheets prior to the application of any chemical. The contractor must warranty materials and workmanship for 15 years against defects after completion of work. Any defects from fault materials during the warranty period must be repaired or replaced at no cost to the district. The contractor must offer customer service and technical support.

Award

Educational

$145,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
46
Bidding Soon
821
All Active Projects
399
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 1, 2024

img_map_placeholder

Multiple Locations, Greenwood, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.