Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Banner Elk, North Carolina. Contact the soliciting agency for additional information.
Note: Provide signed / dated amendments with proposal submission. Amendment 0004: The due date for solicitation 12445224B0008 has been extended by one day, to NLT 1300, Thursday, June 20th (amendment 0004) This time extension (via amendment 0004) is to provide for "reading of the bids". Reading of the bids will take place, at exactly 1300 EST, Thursday, June 20th, 2024. Call in -Log in data listed below. Attendance to this virtual / call-in appointment is "not" required, all who provide an offer will be notified via email of the results (winning company / amount) after the reading of the bids has taken place. With you proposal submission, provide the signed / dated 1442 form (original solicitation), SOI (updated with amendment # 0003), and all four (4) signed amendments. Pay special attention to amendment 0003, it "revises" the SOI ---use this version to submit your pricing We ask that you please email your proposal submission documents to the listed POCs (John Davidson / Penny Zortman) by 11:00 AM EST, 20 June ---if at all possible, this allows for the time needed to compile / organize the proposals before the actual bid reading teleconference. But---1300 EST is the absolute deadline for proposal submission Call in information: Microsoft Teams To Join Online: Meeting ID: 260 208 747 47 Passcode: Uik5zr Dial in by phone 1 (202) 650-0123 Phone conference ID: 418 251 41# Amendment 0003: ***The proposal due date has been extended*** The RFP is due NLT 1700 EST, Wednesday, June 19th, 2024 Purpose: The purpose of this amendment is to extend the proposal due date and to provide for the following, revised documents. 1. The Section J Attachment #1, SOW has changed to the updated version associated with this amendment. 2. The Section J Attachment #2 SOI-Road Work has been "REPLACED" to this version attached with this amendment ----There is now only one (1) base period and one (1) option. 3. The Section J Attachment #3 Revised Specifications 4. The Section J Attachment #6-Revised Activity Schedule 5. Added Document - Attached with this amendment - Description of Work Amendment 0002: This amendment provides for a revised activity schedule, that features location coordinatees of the roads in the maintenance schedule. Refer to the listed attachments within this solicitation for the documentation. The proposal due date remains unchanged--proposals remain due NLT 1700 EST June 6th, 2024. Amendment 0001: Project: FY 2024 Grandfather Road Maintenance Purpose: The purpose of this amendment is to extend the proposal due date, from 5/31/2024 to NLT 1700 EST, Thursday, June 6th 2024. Additionally, the pre-bid site visit date and address have changed. The pre-bid site visit will now be held on Friday, May 24th at 9 AM EST. Location: 109 E. Lawing Dr; Nebo, NC 28761. Any / all questions resulting from the site visit and/or via email must be received NLT 1200 EST, Thursday, May 30th 2024. Questions will be answered and compiled into an amendment. All other terms & conditions remain unchanged. Project: FY 2024 Grandfather Road Maintenance NOTE: Pre-bid Site Visit scheduled for May 20th, 2024 (Monday) - 10 AM EST Location: Pisgah National Forest Visitors Center, 1600 Pisgah Hwy. Pisgah Forest, NC 28768, (attendance to the pre-bid site visit is not mandatory for proposal submission, but encouraged) Road Reconditioning of 37.9 miles in the Grandfather Ranger District. Work Includes the blading and shaping the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood, and other materials. Maintain ditches to achieve proper drainage. Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway. Clean drainage structures, inlets, catch basins and outlets. Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets. Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow. Option Items. Additional 12.7 miles of road reconditioning work in addition to 2,080 tons of ABC Stone placement and compaction. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Roads / Highways
$250,000.00
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 20, 2024
July 22, 2024
Grandfather Rd, Banner Elk, NC
Related To This Project
Banner Elk, NC
Bid Date: Jun 03 2024
Banner Elk, NC
Bid Date: Oct 30 2024
Banner Elk, NC
--
Banner Elk, NC
--
Banner Elk, NC
--
Banner Elk, NC
Bid Date: Jun 22 2022
Banner Elk, NC
Bid Date: Nov 04 2021
Banner Elk, NC
Bid Date: Sep 08 2023
Banner Elk, NC
Bid Date: Sep 21 2023
Banner Elk, NC
Bid Date: Jun 13 2023
Banner Elk, NC
Bid Date: Jun 16 2022
Banner Elk, NC
Bid Date: Sep 01 2022
Banner Elk, NC
Bid Date: Apr 21 2022
Kings Mtn, NC
Bid Date: May 14 2024
Cherry Point, NC
Bid Date: Jun 04 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.