BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Bedford, Kentucky. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Bids will be received on the basis of the following requirements. 1. All contractors must be prequalified by the Commonwealth of Kentucky, Transportation Cabinet. 2. Work must be performed in accordance with the latest edition of the Kentucky Transportation Cabinet Department of Highways Standard Specifications for Road and Bridge Construction and any Supplemental Specifications. 3. All work will be subject to the direction, inspection, and approval of the Trimble County Board of Education Finance Officer or his designated representative. 4. Contractors shall carry necessary insurance required by the Kentucky Transportation Cabinet and must submit certificate to Trimble County Board of Education before performing work. 5. Trimble County Board of Education reserves the right to reject any and all bids and waive informalities and make awards in a manner deemed to be in the best interest of the Trimble County Board of Education. SCOPE OF SERVICES The work is to be scheduled and completed between July 1, 2024 - August 6, 2024. The required services for the parking lot of the Trimble County Jr/Sr High School located at 1029 Highway 421 North, Bedford, KY 40006 are as outlined below. Marking Asphalt Surfacing Contractor shall provide smooth transitions to all existing surfaces and paving. Cleaning: Sweep surface with power broom supplemented by hand brooms to eliminate loose material and dust. Do not begin marking asphalt surfacing until acceptable to maintenance director. Parking Striping: Use a traffic lane marking paint with chlorinated rubber, alkyd type, FS TT-P-115, Type 1, factory-mixed, quick drying, non-bleeding. Paint with mechanical equipment proving uniform, straight edges applied in one coat at manufacturers recommended rates. Minimum Quality Requirements General: In addition to other specified conditions, comply with the following minimum quality requirements. Test the in-place asphalt concrete base and surface courses for compliance with the requirements for compaction, thickness and surface smoothness. Provide final surfaces of uniform texture, conforming to the required grades. Asphalt concrete materials not complying with specified requirements will not be acceptable. Repair or remove and replace defective paving as directed by maintenance director. There shall be no depressions in the paving or other areas prepared by Contractor that hold water.

Award

Sidewalks / Parking Lot

$242,935.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
127
Bidding Soon
1,984
All Active Projects
982
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 13, 2024

July 1, 2024

August 6, 2024

img_map_placeholder

1029 US-421, Bedford, KY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.