BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Pittsburgh, Pennsylvania. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Deice Pads Pavement Rehabilitation at Pittsburgh International Airport Attention is Called to the Fact That Not Less Than the Minimum Salaries and Wages, as Determined by the Pennsylvania Department Of Labor and Industry, Must Be Paid on These Projects. The Airport Authority Reserves the Right to Reject Any and All Bids or Waive Any Informalities in the Bidding. No Bidder May Withdraw His Bid for a Period of Sixty [60] Days After the Scheduled Closing Time for Receipt of Bids. MBE (6.3%), WBE (6.9%) Construction Notice to Proceed - Anticipated July 2024 End Construction - Anticipated September 2024 Phase 1 - Sierra Deicing Pad Contractors will place the temporary low-profile barricades and E&S control devices Pavement rehabilitation including joint and crack resealing and spall repair will be done. Removal of temporary barricades and E&S control devices. General clean-up for the site. Phase 1 duration for the Sierra deicing pad will be 30 calendar days. Closures during Phase 1 will be limited to the Sierra deicing pad. Phase 2 - Sierra Deicing Pad Contractors will place the temporary low-profile barricades and E&S control devices Pavement rehabilitation including joint and crack resealing and spall repair will be done. Removal of temporary barricades and E&S control devices. General clean-up for the site. Phase 2 duration for the Sierra deicing pad will be 10 calendar days. Closures during Phase 2 will be limited to the Sierra deicing pad and Taxiway 'Z' between Taxiway 'E' and the northern limit of the deicing apron. Phase 3 - Sierra Deicing Pad Contractors will place the temporary low-profile barricades and E&S control devices Pavement rehabilitation including joint and crack resealing and spall repair will be done. Removal of temporary barricades and E&S control devices. General clean-up for the site. Phase 3 duration for the Sierra deicing pad will be 10 calendar days. Closures during Phase 3 will be limited to the Sierra deicing pad, Taxiway 'Z' between Taxiway 'E' and the northern limit of the deicing apron, and Taxiway 'E'. Phase 1 - Charlie Deicing Pad Contractor will begin mobilization. A staging area will be established, and a survey/layout will be completed. Contractors will place the temporary low-profile barricades and E&S control devices. Pavement rehabilitation including joint and crack resealing and spall repair will be done. Removal of temporary barricades and E&S control devices. General clean-up for the site. Phase 1 duration for the Charlie deicing pad will be 10 calendar days. Closures during Phase 1 will be limited to the Charlie deicing pad, Taxiway 'C' (between Taxiway 'T' and Taxiway 'B1'), Phase 2 - Charlie Deicing Pad Contractors will place the temporary low-profile barricades and E&S control devices. Pavement rehabilitation including joint and crack resealing and spall repair will be done. Removal of temporary barricades and E&S control devices. General clean-up for the site. Phase 2 duration for the Charlie deicing pad will be 7 calendar days. Closures during Phase 2 will be limited to the Charlie deicing pad, Taxiway 'B' between Taxiway 'V' and Taxiway 'B1', Taxiway 'T' between Taxiway 'V1' and Taxiway 'B', Taxiway 'C' between Taxiway 'V' and Taxiway 'T', and Taxiway 'AA' and Taxiway 'B2'. Phase 3 - Charlie Deicing Pad Contractors will place the temporary low-profile barricades and E&S control devices. Pavement rehabilitation including joint and crack resealing and spall repair will be done. Removal of temporary barricades and E&S control devices. General clean-up for the site. Phase 3 duration for the Charlie deicing pad will be 7 calendar days. Closures during Phase 3 will be limited to the Charlie deicing pad, Taxiway 'B' between Taxiway 'B2' and Taxiway 'N', Taxiway 'A' between Taxiway 'AA' and Runway '28R', and Taxiway 'B1'.

Post-Bid

Transportation Terminals

$600,000.00

Public - County

Paving, Site Work

27

17

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
50
Bidding Soon
1,025
All Active Projects
386
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

July 1, 2024

img_map_placeholder

1000 Airport Blvd, Pittsburgh, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.