BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 10, 2024 at 8:00 PM

Updated October 31, 2024

Site work for a bridge / tunnel in Aldersyde, Alberta. Completed plans call for site work for a bridge / tunnel.

BRIDGE REHABILITATION AND OTHER WORK 2:12 B.F. 74031N-1 - Sheep River Bridge on Hwy 2, 7 km N of Aldersyde, AB SOUTHERN REGION 1 Lump Sum Traffic Accommodation for Bridge Construction 1,750 Square Metre Surface Removal - Deck 50 Square Metre Partial Depth Repair - Deck 1 Lump Sum Abutment Bearing Stainless Steel Replacements 1 Lump Sum Deck Joint Replacements 1,842 Square Metre Waterproofing 1 Lump Sum Surface Preparation and Painting - Girder Ends and Diaphragms 1 Lump Sum Protection of the Environment 1 Lump Sum Concrete Cleaning and Sealing 382 Tonne Asphalt Concrete Pavement - Mix Type H2 (PG 58-28) Contractor to supply all materials. Documents can be obtained from www.purchasingconnection.ca.

Award

Bridges / Tunnels

$1,587,000.00

Public - State/Provincial

Site Work

54

12

23

8

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
0
Bidding Soon
303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.