BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2024 at 8:00 PM

Updated June 28, 2024

Site work and paving for a sidewalk / parking lot in Horizon City, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Removal and replacement of various sidewalk sections throughout the City. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Description of work: *Saw cut as needed (see pictures with removal description below). Remove and dispose of existing concrete material (area marked in red). * Cut/fill as necessary to pour 4 inches of 3000 psi concrete (area marked in red). Then Compact the area. *Add 6 x 6 - 6/6 W.W.F. to the area of work (area marked in red). Wire Mesh will be provided by Horizon City. *Coordinate with the Town of Horizon for inspections for inspection of slope and forms. *Pour 4 inches of 3000 psi concrete (area marked in red) with 2% max. Cross slope and 5% max. Running slope. *Concrete finish shall be rough (area marked in red). *Provide expansion joint material at all sides where new concrete meets existing sidewalk or driveway. *Where existing buckled slabs exceed 5ft. in length, provide control/contraction joints spaced evenly. *Match existing sidewalk width. *Dispose of Material properly. *Provide Traffic Control to comply with Horizon City's design standards for construction. *Coordinate and notify homeowners when the work will be performed. *Return adjacent landscaping/concrete/curb/rock walk area disturbed back to the original state. * Notify 811 ''one call'' notification system *Contractors shall comply with all safety requirements from Federal, State and local entities. All applicable safety requirements for the job shall be the responsibility of the contractor to provide safety vests, hardhat, boots, shoring box, proper traffic control equipment among other items. * Horizon City is not responsible for delayed mail, carrier, etc. and the time/date stamp clock used upon receipt of any bid in the Public Works Department shall be the official time of receipt.

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
6
Bidding Soon
248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2024

June 17, 2024

Project location map

Multiple Locations, Horizon City, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.