Site work for a civil project in Gadsden, Alabama. Completed plans call for site work for a water / sewer project.

Gadsden Sports Park Irrigation Pumping project Question Deadline: 05/09/2024, Submit requests for these documents and questions to Jake.Ross@cdge.com at least five days prior to the scheduled bid opening. The bidder shall file with his bid either a cashier's check drawn on an Alabama bank, payable to the City of Gadsden, Alabama, or a bid bond executed by a surety company duly authorized and qualified to make such bonds in Alabama, in an amount equal to the lesser of five percent (5%) of the bid or ten thousand ($10,000). The Bidder's qualifications shall be considered in awarding the Bid for this project. Each bidder is to complete and submit Division 107 - Bidder's Qualifications at the time of the Bid. No Con-tract will be awarded to any Bidder who does not submit the required Bidder's Qualifications. The apparent low bidder will be required to submit their list of subcontractors within two days of the bid opening date to confirm compliance with the experience and qualification requirements listed in the technical specifications of each applicable trade before being considered for award. The successful bidder will be required to furnish and pay for the satisfactory Performance and Payment Bond or Bonds in the amount required by Section 39-1-1(a), Code of Alabama 1975, and evidence of insurance as required by the bid documents within ten (10) days after being notified that he has been awarded the contract. No bidder may withdraw his bid within six (60) days after the actual date of the opening there-of. The bidder must comply with all requirements of the public works bid law Section 39-2-1 et seq., Code of Alabama 1975. The Owner reserves the right to reject any or all bids and to waive any informalities and to award the contract to the lowest, responsible, responsive bidder. All bidders must comply with the requirements of the Contractor's Licensing Law of the State of Alabama and be certified for the type work on which the proposal is submitted. Any bidder, whether a resident or non-resident of the State of Alabama, must comply with all applicable provisions of Section 34-8-1, et.seq., Code of Alabama, 1975, including requirements for licensing as a general contractor and the necessity to show evidence of license, before the bid will be considered by the awarding authority. A current license number must be clearly dis-played on the outside of the sealed envelope in which the construction proposal is submitted. Bidders must comply with the President's Nos. 11246 and 11375 which prohibit discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must also comply with Title IV of the Civil Rights Act of 1964, Title VIII of the Civil Rights Act of1968, and Section III of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 170lu. By signing this contract, the contracting parties affirm, for the duration of the agreement, that they will not violate federal immigration law or knowingly employ, hire for employment, or continue to employ an unauthorized alien within the state of Alabama. Furthermore, a contracting party found to be in violation of this provision shall be deemed in breach of the agreement and shall be responsible for all damages resulting therefrom. SCOPE OF WORK A. PACKAGED PUMP STATION The Packaged Pump Station supplier shall provide a SUCTION LIFT END-SUCTION pump station complete with pump, piping, filters, valves, sensors, Variable Frequency Drives, programmable logic controller (PLC), UL 508A listed control panel, and all appurtenances necessary for a complete and functioning pumping system. The pump station -including the pump control panel-shall be designed and manufactured within the confines of a UL 508A, UL QCZJ, & ISO 9001:2015 certified facility. Electrical connection, by purchaser, shall consist of a single conduit from owners disconnect to the pump station main disconnect. B. FACTORY TESTING The pump station manufacturer shall conduct and document a complete factory dynamic test of the pump station prior to shipment. Pump stations shall be tested throughout the entire operating range at the net discharge pressure called for in the technical specifications. Individual pump pressure, flow, RPMs, volts, amps, KW, and power factor shall be documented for verification by the Owners' Representative prior to delivery upon request. 1. Hydrostatic Testing. The packaged pump station shall undergo hydrostatic testing that meets ANSI/HI specifications and standards. 2. Vibration Testing. The packaged pump station shall undergo vibration testing that meets ANSI/HI 9.6.4-Vibration Measurement and Allowable Values- specifications and standards. 3. Flow Testing. The packaged pump station shall undergo Hydraulic Performance Acceptance testing that meets ANSI/HI 14.6 specifications and standards. 4. Wet Test. The entire pump station shall be completely wet tested at the manufacturing facility prior to shipping.

Award

Water / Sewer

$560,718.00

Public - City

Site Work

12

12

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
32
Bidding Soon
746
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

June 13, 2024

img_map_placeholder

To Be Determined, Gadsden, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.