Site work and paving for a road / highway in Soap Lake, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Schedule A: Marinas Drive and 1st Avenue North East Improvements Schedule A provides for roadway improvements for approximately 480 LF of Marinas Drive (formerly Canna Street North) from Main Avenue East to Smokiam Park, and 420 LF of 1st Avenue NE from Daisy Street (SR 17) to Marinas Drive. The work includes, but is not limited to, pulverizing the existing pavement, excavation, grading, subgrade preparation, cement treated base, hot mix asphalt, storm drainage improvements, cement concrete curb, gutters, curb ramps, sidewalks, driveway entrances, pavement markings, utility adjustments, traffic control, miscellaneous surface restoration, and all other appurtenances required to complete the work in accordance with the attached Contract Plans, these Special Provisions, and the Specifications. Schedule B: Main Avenue West Reconstruction Schedule B provides for roadway improvements for approximately 1,200 LF of Main Avenue West from Cherry Street to Ginkgo Street. The work includes, but is not limited to, pulverizing the existing pavement, excavation, grading, subgrade preparation, cement treated base, hot mix asphalt, storm drainage improvements, cement concrete curb, gutters, curb ramps, sidewalks, driveway entrances, pavement markings, utility adjustments, traffic control, miscellaneous surface restoration, and all other appurtenances required to complete the work in accordance with the attached Contract Plans, these Special Provisions, and the Specifications. The Work shall be substantially complete within 90 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Soap Lake, Washington. Bond Notes : All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Soap Lake" and in an amount of not less than five percent (5%) of the total Proposal amount. As required by the Contract, a postal money order, certified check, cashier's check or Proposal bond made payable to the Owner is attached hereto. If this Proposal is accepted and the undersigned fail(s) or refuse(s) to enter into a contract and furnish the required performance bond, labor and material payment bond, special guarantee bonds (if required), required insurance and all other required documentation, the undersigned will forfeit to the Owner an amount equal to five percent of the Proposal amount. Owner Rights: The City of Soap Lake expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal. The undersigned agrees that the Owner reserves the right to reject any or all Proposals and to waive any minor irregularities and informalities in any Proposal. ENGINEER'S ESTIMATE 1,540,000 - 1,590,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,479,294.00

Public - City

Paving, Site Work

43

6

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
2
Bidding Soon
89
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

July 8, 2024

img_map_placeholder

Multiple Locations, Soap Lake, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.