BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Port Orchard, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project Description Tremont Street is an arterial corridor within the City of Port Orchard that lacks adequate pedestrian and bicycle facilities. Improvements are needed between Port Orchard Blvd and Sidney Avenue. This project is intended to study and evaluate non-motorized connectivity along the corridor, and to develop and evaluate alternatives. Evaluation will include how to improve non-motorized connectivity between neighborhoods on both sides of the busy arterial, as well as to Van Zee park along the corridor. Conceptual designs will be prepared for alternatives. In preparation for future phases, the consultant will complete a preliminary design of the selected improvement to 90% design. Improvements may include sidewalks, planter strips, bike lanes, crosswalks and crosswalk treatments, intersection improvements, and related street lighting and permanent traffic control. Future work is likely to include acquisition of additional right of way for sidewalks and bike lanes. The project is funded by the State Pedestrian & Bicycle program. The goal is to complete outreach and preliminary engineering in 2024 to position the City to apply for grant funding for future phases. The City of Port Orchard reserves the right to retain the services of the successful firm for any subsequent phases associated with this project. Scope of Work The Work to be performed by the CONSULTANT consists of providing to the City services including; 1) Alternatives development, technical memorandum, and public outreach. 2) Roadway, stormwater, and illumination design (PS&E) including illumination modeling with AGI32 software, and stormwater drainage report. 3) Surveying and right of way plans. 4) Environmental permitting including SEPA and local critical areas permits. 5) Construction administration and inspection in accordance with the LAG manual Services include oversight on the CITY's behalf to be completed in accordance with the Washington State Department of Transportation (WSDOT) Local Agency Guideline Manual, and the CITY's approved Right of Way Acquisition Procedures. Qualifications Submittal Deadline May 17, 2024 Any questions regarding this project should be directed to Christian Williams, at cwilliams@portorchardwa.gov and bidsandproposals@portorchardwa.gov Americans with Disabilities Act (ADA) Information The City of Port Orchard in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by emailing the Public Works Department at publicworks@portorchardwa.gov or by calling collect (360) 876-4991. Title VI Statement The City of Port Orchard, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award." Dates of publication in the Kitsap Sun: April 26, 2024, and May 3, 2024 and the Daily Journal of Commerce: April 26, 2024, and May 3, 2024

Conceptual

Sidewalks / Parking Lot

$3,467,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
49
Bidding Soon
879
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2025

img_map_placeholder

Sidney Ave, Port Orchard, WA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.