BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Huntington Park, California. Completed plans call for the renovation of a 2,650-square-foot, two-story above grade educational facility.

Cooling Tower Replacement & Structural Repair (PSA) location - 6537 Malabar St Huntington Park, CA 90255 Bidder must abide by and comply with the OWNER Construction Safety Standards, including prime contractor, subcontractor and/or safety prequalification requirements for bidder and all tiers of its subcontractors, as applicable, before tendering the bid to OWNER. Please e-mail prequalification@laschools.org to request for prequalification questionnaires and requirements. Bidders should note that the OWNERs prequalification requirements include mechanical, electrical, and plumbing contractors (i.e contractors licensed pursuant to Sections 7056-7059 of the Business and Professions Code, specifically holding A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C43, or C-46 licenses pursuant to regulations of the Contractors State License Board) that contract directly with a bidder to perform any such component work on the Project (MEP subcontractors). DSA FILE #19-63 DSA APP #03-122033 Completion- 230 calendar days The undersigned is familiar with the terms of the Contract, the local conditions affecting performance of Contract, the cost of the Work at the place where the Work is to be done, and with the Drawings, Specifications and all other Bidding Documents. The undersigned hereby proposes and agrees to perform, within the Contract Time stipulated, the Work including all of its component parts; and to provide and furnish any and all of the labor, materials, tools, apparatus, facilities, expendable equipment, and all utility and transportation services necessary to perform the Work in accordance with the Contract and complete all Work in a workmanlike manner for: MIDDLETON ELEMENTARY SCHOOL - COOLING TOWER REPLACEMENT AND STRUCTURAL REPAIR (PSA) 10373681 / 223887 REMOVE THE EXISTING COOLING TOWER. REPAIR THE STRUCTURAL SUPPORT OF THE COOLING TOWER. INSTALL THE NEW COOLING TOWER AND WATER FILTER ON THE ROOF. REFER TO T-3.0 FOR THE COMPLETE SCOPE OF WORK.

Bid Results

Educational

$1,755,000.00

Public - County

Renovation

21

29

5

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
105
Bidding Soon
2,245
All Active Projects
1,000
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2024

June 22, 2024

img_map_placeholder

6537 Malabar St, Huntington Park, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.