BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Bakersfield, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

In exchange for the Compensation (defined below), CONTRACTOR must perform the work outlined in the Special Provisions for the Project (Scope of Work). The Scope of Workshall include all items and procedures necessary to properly complete the task CONTRACTOR has been hired to perform, whether specifically included in the Scope of Work or not. The following documents are incorporated herein as if fully set forth Notice to Contractors Special Provisions Bid Proposal Bidder's Bond Performance Bond Material and Labor Bond Letters of transmittal, if any All provisions required by law to be inserted in this Agreement whether actually inserted or not Current State of California DAS 140 Form (if required by Specifications) Drawings, if any All questions must be received by the CITY in written form on the form provided no later than 10:00 A.M. seven calendar days prior to the scheduled bid opening. License Requirements Class A THE PURPOSE OF THIS PROJECT is to rehabilitate and extend the service life of the pavement on Panama Lane from Gosford Road to Stine Road. The project funding consists of RSTP (Federal funds). THE WORK CONSISTS OF, in general, rehabilitating the existing pavement structural section by constructing a new pavement section using Rubberized Hot Mix Asphalt (R-HMA) and Hot Mix Asphalt (HMA), adjusting manhole and monument covers, construction of minor concrete for ADA accessible ramps, curb and gutter, and cross gutters, and placing striping, pavement markings and traffic signal detector loops. The rehabilitation methodologies will consist of full depth reconstruction. THE ESTIMATED CONSTRUCTION COST of this project is $5,836,000. THE ESTIMATED CONSTRUCTION TIME FRAME for this project is anticipated from July 2024 to September 2024.

Award

Roads / Highways

$6,577,779.00

Public - City

Paving, Site Work

17

10

12

6

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
26
Bidding Soon
476
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2024

July 29, 2024

img_map_placeholder

Panama Ln, Bakersfield, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.