EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 9, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Hinton, Oklahoma. Completed plans call for site work for a road / highway; and water / sewer project.

HEDA Water and Wastewater System Improvements Contract I - Hinton Business Park Phase I - 4,100 L.F. 8" PE DR 11, 10-8" Gate Valves, 2 - Fire Hydrants and Valves, 60 L.F. - Directional Boring & 12" PE DR 11 Casing, 5 - Connections to Existing Water Lines, - Love's Extension - 1,150 L.F. 8" PE DR 11, 1,000 L.F. 12" PE DR 11, 3 - 8" Gate Valves, 2 - 12" Gate Valves, 2 - Fire Hydrants and Valves, 280 L.F. Directional Bore & 12" Steel Casing, 2 - Connections to Existing Waterline and all appurtenances. Contract II - Hinton Business Park Phase I - 1,480 L.F. 8" PE DR 13 Gravity Sewer Line, 5 - Manholes - Sparks North Addition - 1,830 L.F. 8" PE DR 13 Gravity Sewer Line, 6 - Manholes and all appurtenances Alternate Bid - 1,950 L.F. 12" PE DR 11, 1-12" Gate Valve, 1 Connection to Exist. WL, 1,500 L.F. - 8" PE DR 11, 2- 8" Gate Valves, 2 Connections to Existing WL and all appurtenances. A bid bond in the amount of 5% of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will within ten (10) days from the date of notice of award, enter into contract and file the required bonds, and furnish a certificate of Workers' Compensation and General Contractors Liability Insurance. A PERFORMANCE BOND and a PAYMENT/STATUTORY BOND, MAINTENANCE BOND each in the amount of 100 PERCENT of the CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. BIDDER hereby agrees to commence WORK under this contract within ten (10) days of the date to be specified in the NOTICE TO PROCEED and to fully complete the PROJECT within 90 consecutive calendar days thereafter. BIDDER further agrees to pay as liquidated damages, the sum of $300.00 for each consecutive calendar day thereafter as provided in Section 15 of the General conditions. The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof.

Award

Water / Sewer

$1,000,000.00

Public - City

Site Work

27

6

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
41
Bidding Soon
439
All Active Projects
213
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

August 9, 2024

img_map_placeholder

Multiple Locations, Hinton, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water and Wastewater System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.