BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a power facility in Farmington, New Mexico. Completed plans call for site work for a power facility.

The City of Farmington Electric Utility Systems (FEUS) is seeking bids for the civil work associated with the expansion and improvement to the Bergin Substation in Farmington New Mexico. The work to be performed under this contract shall consist of furnishing all labor, equipment and materials necessary for the expansion and improvement of the Bergin Substation. Question Cuttoff Date & Time 5/16/2024 03:00:00 PM (MT) The civil work expansion and improvements will include 1) Construction of trapezoidal shaped, filter fabric and riprap lined drainage channels (RLC) on the east and west sides of the existing substation yard. The East channel extends from the new diversion dike south to the outfall. West channel to extend from new HDPE pipe culvert southeast to existing drainage ditch. 2) Construction of approximately 441 linear feet of rectangular-shaped open concrete drainage channel along the north side of the substation yard to include the cast-in-place concrete headwall interfacing with the upstream invert of the existing 24" HDPE pipe. 3) Construction of approximately 91.0 lineal feet of trapezoidal-shaped concrete diversion dike structure and a V-shaped swale along the east side of the substation. 4) The station ground grid extends 3' past the fence and is laid out on 20' squares at a depth of approximately 18". Should the existing ground grid be accidentally exposed and/or damaged during construction, the Contractor shall contact FEUS immediately. The Contractor will be responsible for repairing the damage. 5) Demolish three (3) breaker foundations and dispose of material after breakers have been removed by others. 6) Construct three (3) breaker foundations including over-excavation, structural fill, compaction, and installation of owner-supplied conduit and anchor bolts. Maintain the existing 4/0 bare copper grounds and route them to the edge of the new foundation. Install Grounds as needed or damaged. 7) Remove and replace underground PVC conduit to four (4) Circuit Breakers from the cable trench through the circuit breaker foundation. Core drilling, grouting and sealing new and abandoned entrances is expected. Hydrovac excavation may be necessary. 8) Install two (2) 4'-6" diameter by 15' deep drilled pier foundations including installation of supplied anchor bolt cages. 9) Install a 6" layer of approved high-impedance crushed aggregate stone inside the yard fence in the areas identified in the Grading Plan. The Engineer's Opinion of Probable Construction Costs (OPCC) is $816,539.24. No bids Received.

Bid Results

Power Plant

$1,087,108.00

Public - City

Site Work

24

6

4

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
57
All Active Projects
26
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2024

July 5, 2024

img_map_placeholder

To Be Determined, Farmington, NM

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.