Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a power facility in Farmington, New Mexico. Completed plans call for site work for a power facility.
The City of Farmington Electric Utility Systems (FEUS) is seeking bids for the civil work associated with the expansion and improvement to the Bergin Substation in Farmington New Mexico. The work to be performed under this contract shall consist of furnishing all labor, equipment and materials necessary for the expansion and improvement of the Bergin Substation. Question Cuttoff Date & Time 5/16/2024 03:00:00 PM (MT) The civil work expansion and improvements will include 1) Construction of trapezoidal shaped, filter fabric and riprap lined drainage channels (RLC) on the east and west sides of the existing substation yard. The East channel extends from the new diversion dike south to the outfall. West channel to extend from new HDPE pipe culvert southeast to existing drainage ditch. 2) Construction of approximately 441 linear feet of rectangular-shaped open concrete drainage channel along the north side of the substation yard to include the cast-in-place concrete headwall interfacing with the upstream invert of the existing 24" HDPE pipe. 3) Construction of approximately 91.0 lineal feet of trapezoidal-shaped concrete diversion dike structure and a V-shaped swale along the east side of the substation. 4) The station ground grid extends 3' past the fence and is laid out on 20' squares at a depth of approximately 18". Should the existing ground grid be accidentally exposed and/or damaged during construction, the Contractor shall contact FEUS immediately. The Contractor will be responsible for repairing the damage. 5) Demolish three (3) breaker foundations and dispose of material after breakers have been removed by others. 6) Construct three (3) breaker foundations including over-excavation, structural fill, compaction, and installation of owner-supplied conduit and anchor bolts. Maintain the existing 4/0 bare copper grounds and route them to the edge of the new foundation. Install Grounds as needed or damaged. 7) Remove and replace underground PVC conduit to four (4) Circuit Breakers from the cable trench through the circuit breaker foundation. Core drilling, grouting and sealing new and abandoned entrances is expected. Hydrovac excavation may be necessary. 8) Install two (2) 4'-6" diameter by 15' deep drilled pier foundations including installation of supplied anchor bolt cages. 9) Install a 6" layer of approved high-impedance crushed aggregate stone inside the yard fence in the areas identified in the Grading Plan. The Engineer's Opinion of Probable Construction Costs (OPCC) is $816,539.24. No bids Received.
Bid Results
Power Plant
$1,087,108.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2024
July 5, 2024
To Be Determined, Farmington, NM
Related To This Project
Farmington, NM
--
Farmington, NM
Bid Date: Jun 11 2024
Farmington, NM
Bid Date: Jun 06 2024
Farmington, NM
Bid Date: Jun 06 2024
Farmington, NM
Bid Date: May 24 2024
Farmington, NM
Bid Date: Jun 25 2024
Farmington, NM
Bid Date: May 22 2024
Farmington, NM
Bid Date: Jun 12 2024
Farmington, NM
--
Farmington, NM
--
Farmington, NM
--
Farmington, NM
--
Farmington, NM
Bid Date: May 15 2024
Farmington, NM
Bid Date: May 08 2024
Farmington, NM
Bid Date: Apr 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.