BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Green Bay, Wisconsin. Working plans call for the renovation of a educational facility.

As of July 29, 2024, bids received were rejected as they were over the budget. Project will rebid but no definite date yet. The outside of the envelope shall be marked "SEALED BID FOR HEAD START WINDOW REPLACEMENT" along with the contractors' name. A Single Prime Bid from a General Contractor will be received for all work and will hold all subcontracts and provide a single bond as a single source of construction responsibility. In general, work to consist of removing existing wood windows and trim and replacing with new aluminum casement windows with wood trim in offices and classrooms and removing existing aluminum window wall in the boiler room and replacing with new aluminum store front window wall. Plans will be available April 26, 2024 from Architects Group Ltd. Plans sent out electronically will be free of charge. Hard copies of Plans and Specifications if requested will be billed at printing and shipping costs. The successful General Contractor Bidder will be required to furnish and pay for satisfactory Performance Bond and Labor and Material Payment Bond, each in the amount of 100% of the Contract and to be executed on AIA Form A312 attached to Bid Documents. Bid Form, Bid Bond, and Form of Non-Collusive Affidavit shall be submitted with Bid. Failure to do so may be the cause for rejection of bid. Copies of the above-mentioned forms are in the specification book. The Owner reserves the right to reject any or all Bids, or to waive any informalities in the bidding. No Bid shall be withdrawn for a period of sixty (60) consecutive calendar days subsequent to the opening of Bids without the consent of the Owner. No proposal will be accepted unless accompanied by a Bid Bond or Certified Check in the amount of not less than 5 percent of the total Base Bids, payable to the Green Bay Area Public School District, Green Bay, Wisconsin, as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract and bonds within 10 days after the award of contract. The District will ultimately award the project to the General Contractor and Subcontractors that provides them with the best combination of experienced team members, local participation, and lowest cost.

Final Planning

Educational

$154,990.00

Public - City

Renovation

6

13

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
18
Bidding Soon
259
All Active Projects
105
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2024

December 12, 2024

img_map_placeholder

1150 Bellevue St, Green Bay, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.