BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Las Vegas, Nevada. Completed plans call for the renovation of a transportation facility.

Public Works Project (PWP)# CL-2024-350 The project includes the replacement of 6 Air Handling Units at LAS C-Gates. The remodel work includes removal and replacement of designated AHUs and associated components, removal and installation of new floor sinks, removal and replacement of associated electrical equipment, removal and preparation of equipment pads, miscellaneous wall infills and patching, touch-ups to cove bases in mechanical rooms, and painting. The project is for the Department of Aviation. This is a Prevailing Wage Project. Please note: Workforce Checklist AND Waiver are REQUIRED by D.O.A. (located in the Files/Plans Room) This project is within an operating airport terminal. Badging will be required for your employees. The proposed Contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Federal Labor Provisions. It is the policy of the Clark County Department of Aviation (OWNER) to promote the objectives of the United States Department of Transportation (DOT) with respect to the participation of Disadvantaged Business Enterprises (DBEs) in DOT-assisted contracts. This policy has been formulated to comply with 49 CFR Part 26. The requirements of 49 CFR part 26 apply to this Contract. It is the policy of the OWNER to practice nondiscrimination based on race, color, national origin, sex, or sexual orientation in the award or performance of this contract. The OWNER encourages participation by all firms qualifying under this solicitation regardless of business size or ownership. Question Deadline 05/15/2024 at 10:00 PM PT Questions regarding the use of the NGEM system may be directed by email to the designated Contract Representative. Bidders requiring clarification or interpretation of the Bidding Documents shall submit such in NGEM under the Questions Tab by the deadline specified in the Activities Tab. Questionsreceived after the specified date will have no guarantee of review. Each Bidder is encouraged to submit questions concerning the Bid documents in the NGEM Questions Tab. Verbal questions will not b The OWNER, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 200d-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. All pre-bid RFIs need to be submitted to MHC prior to 5/13/24 at 12 PM in order to be answered The proposed Contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Federal Labor Provisions. All labor on the project shall be paid no less than the minimum wage rates established by the U.S. Secretary of Labor and the State of Nevada. The EEO requirements, labor provisions and wage rates are included in the specifications and bid documents and are available for inspection at the Department of Aviation, Harry Reid International Airport, Contracts Office, 1845 East Russell Road, 3rd Floor, Las Vegas, Nevada, 89119. Each Bidder must supply all the information required by the bid documents and specifications. Each Bidder must furnish a Bid Guarantee equivalent to the appropriate percentage of the Bid Price described in Instructions to Bidders, Article 11.2, of the Contract documents. The "Bid Guarantee" shall consist of a firm commitment such as a Bid Bond, certified check, or other negotiable instrument accompanying a Bid as assurance that the Bidder will, upon acceptance of his Bid, execute such contractual documents as may be required within the time specified. The successful Bidder agrees to furnish a performance bond for 100 percent of the Contract price. This bond is one that is executed in connection with a Contract to secure fulfillment of all the Bidder's obligations under such Contract. The successful Bidder agrees to furnish a payment bond for 100 percent of the Contract price. This bond is one that is executed in connection with a Contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided in the Contract. OWNER reserves the right to refuse to issue a bid form, or to accept a bid from a prospective Bidder should such Bidder be in default for any of the following reasons: Failure to comply with any pre-qualification regulations of OWNER, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding; or - Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force (with OWNER) at the time OWNER issues the proposal to a prospective Bidder; or - Contractor default under previous contracts with OWNER; or - Unsatisfactory work on previous contracts with OWNER. 2023066.00

Post-Bid

Transportation Terminals

$600,000.00

Public - County

Renovation

79

32

25

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
41
Bidding Soon
621
All Active Projects
302
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.