EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Peoria, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The proposed improvement consists of removing the existing sidewalk, curb, and gutter, existing pavement, and replacing with new sidewalk, ADA Ramps, curb, curb and gutter, pavement and all necessary adjustments, incidentals, and appurtenances. All proposals must be ac-companied by cash, certified check, cashier's check, or a bid bond for not less than five percent (5%) of the amount of the bid. The successful bidder will be required to furnish a satisfactory Performance Bond for the full amount of the contract, with sureties, to be approved by the City Engineer. Compliance with the Illinois Prevailing Wage Act is required under this contract. All provisions regarding EEO, prevailing wage, certified payroll, and DBE and WBE requirements shall be strictly enforced. All work shall be in compliance with specifications and all state and federal laws and regulations. The City of Peoria reserves the right to waive technicalities and to reject any or all proposals. CONTRACT TIME The work shall be completed and ready for final payment within 75 working days

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

23

5

11

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Turf and Grasses, Seeding, Sodding

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
84
Bidding Soon
771
All Active Projects
365
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2024

June 19, 2024

img_map_placeholder

Multiple Locations, Peoria, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

MacArthur Highway Reconstruction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.