BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 4, 2024 at 8:00 PM

Updated February 5, 2025

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Santa Clarita, California. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000351891 The Vista Canyon Bridge and Road Improvements project will construct a new bridge over the Santa Clara River, spanning approximately 780-feet and consist of one lane in each direction with a striped median, safety lighting, concrete barriers, metal railing, raised landscape planter, sidewalk with a Class 1 bike lane, and a new bike trail under the bridge. The project will also provide roadway improvements such as curb, gutter, pavement, base, striping, traffic signal installation, street lights, landscape, storm drain and utility work to the north of the bridge at the intersection of Soledad Canyon Road and the future Vista Canyon Boulevard (currently Lost Canyon Road) and to the south of the bridge at the Vista Ranch Community connection. General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % License(s) Required: License A Question Deadline 05/24/2024 at 11:00 AM PT Bid Questions should be submitted electronically Contact Information: Jaclyn Abston | (661) 255-4936 | jabston@santa-clarita.com Engineer's Estimate: $25 - $26 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$27,426,436.00

Public - City

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

42

45

9

7

Subscribe For Documents

165 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
601
Active Projects
274
Bidding Soon
3,299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2024

August 6, 2024

Project location map

Soledad Canyon Road and Lost Canyon Road, Santa Clarita, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.