Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Santa Clarita, California. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Reference Number 0000351891 The Vista Canyon Bridge and Road Improvements project will construct a new bridge over the Santa Clara River, spanning approximately 780-feet and consist of one lane in each direction with a striped median, safety lighting, concrete barriers, metal railing, raised landscape planter, sidewalk with a Class 1 bike lane, and a new bike trail under the bridge. The project will also provide roadway improvements such as curb, gutter, pavement, base, striping, traffic signal installation, street lights, landscape, storm drain and utility work to the north of the bridge at the intersection of Soledad Canyon Road and the future Vista Canyon Boulevard (currently Lost Canyon Road) and to the south of the bridge at the Vista Ranch Community connection. General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % License(s) Required: License A Question Deadline 05/24/2024 at 11:00 AM PT Bid Questions should be submitted electronically Contact Information: Jaclyn Abston | (661) 255-4936 | jabston@santa-clarita.com Engineer's Estimate: $25 - $26 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$27,426,436.00
Public - City
Demolition, New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2024
August 6, 2024
Soledad Canyon Road and Lost Canyon Road, Santa Clarita, CA
Related To This Project
Santa Clarita, CA
--
Santa Clarita, CA
Bid Date: Dec 01 2020
Santa Clarita, CA
Bid Date: May 01 2020
Santa Clarita, CA
Bid Date: Oct 08 2021
Santa Clarita, CA
Bid Date: Jun 20 2024
Santa Clarita, CA
Bid Date: Jun 10 2024
Santa Clarita, CA
--
Santa Clarita, CA
Bid Date: May 02 2024
Santa Clarita, CA
Bid Date: May 02 2024
Santa Clarita, CA
Bid Date: May 02 2024
Santa Clarita, CA
Bid Date: May 23 2024
Santa Clarita, CA
Bid Date: May 23 2024
Santa Clarita, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.