Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 3, 2025 at 8:00 PM
Updated May 4, 2025
Site work and paving for a road / highway in League City, Texas. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
UPDATE :FY2025: At Intersection of SH 96 and FM 270, Design and Construct the following: extend existing SH 96 East Bound LTL from 450ft to 645ft, extend existing SH 96 West Bound LTL from 400ft to 545ft; extend existing FM 270 South Bound LTL approximately 50ft; extend existing FM 270 North Bound RTL approximately 80ft; and extend the existing FM 270 North Bound LTL approximately 80ft. FY2026 Design: At Intersection of SH 96 and Columbia Memorial Parkway, design and rebuild existing Traffic Signal to current standards; extend existing SH 96 East Bound LTL from 460ft to 640ft; extend existing SH 96 West Bound LTL from 480ft to 525ft. At the Intersection of FM 270 and Coryell & Webster & Austin, design and construct a 250ft RTL to North Bound & South Bound FM 270. FY2027 Construct: Intersection Improvements at SH96/Columbia Memorial and along FM 270.along FM 270. Future projects will come from corridor study completion. The HSIP grant will announce project awards October 2024 (FY2025). The grant did not specify a cost share; however a 75%-25% cost share is programmed in preparation for a match contribution. Project is in City of League City capital budget fy 2025-2029 CIP _________________________________________________________________________________________ FY2024: At Intersection of FM 518 and Bay Area Blvd., Design a South Bound RTL on Bay Area Blvd, extend existing North Bound LTL on Bay Area Blvd from 210ft to 340ft. At Intersection of SH 96 and FM 270, Design and Construct the following: extend existing SH 96 East Bound LTL from 450ft to 645ft, extend existing SH 96 West Bound LTL from 400ft to 545ft; extend existing FM 270 South Bound RTL approximately 50ft; extend existing FM 270 South Bound LTL approximately 50ft; extend existing FM 270 North Bound RTL approximately 80ft; and extend the existing FM 270 North Bound LTL approximately 80ft. FY2025: Construct Intersection improvements at FM 518/Bay Area Blvd and SH 96/FM270 intersections FY2026 Design: At Intersection of SH 96 and Columbia Memorial Parkway, design and rebuild existing Traffic Signal to current standards; extend existing SH 96 East Bound LTL from 460ft to 640ft; extend existing SH 96 West Bound LTL from 480ft to 525ft. At the Intersection of FM 270 and Coryell & Webster & Austin, design and construct a 250ft RTL to North Bound & South Bound FM 270. FY2027 Construct: Intersection Improvements at SH96/Columbia Memorial and along FM 270.along FM 270. The HSIP grant will announce project awards October 2023 (FY2024). The grant did not specify a cost share; however a 75%/25% cost share is programmed incase the city is required to contribute a match The project is include in the City's 2024-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$2,346,550.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
Multiple Locations, League City, TX
Related To This Project
League City, TX
--
League City, TX
--
League City, TX
Bid Date: Jun 04 2025
League City, TX
Bid Date: May 29 2025
League City, TX
Bid Date: Jun 24 2025
League City, TX
--
League City, TX
--
League City, TX
--
League City, TX
Bid Date: Apr 30 2025
League City, TX
Bid Date: Mar 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
