Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Scott, Arkansas. Completed plans call for the renovation of a playground / park / athletic field.
HRC and CMF Building Roofing (2 buildings) HRC Building: Specifications: For .60 mil TPO Roof Contractor to Provide: 1. Prospective contractor shall perform the removal of existing vent boots ridge cap. And the removal of all debris from project site. 2. Prospective contractor shall be responsible for all safety barriers like orange construction fence to keep bystanders out of work areas and at a safe distance or equivalent. 3. Prospective contractor shall be responsible for any permits that maybe required. 4. Prospective contractor shall furnish all materials, tools and labor, equipment to install new. 60 mil TPO mechanically fastened roof system with 1½ expanded polystyrene underlayment or equivalent roof Approx. (1209sq) 5. Prospective contractor shall install new 1 ½ expanded polystyrene flute fill to level up with the ribs of metal roof. 6. Prospective contractor shall mechanically fasten one layer of 1 polyisocyanurate roof insulation over the prepared surface with Firestone/Elevate mechanical heavy duty fasteners and 3 metal insulation plates or equivalent. 7. Prospective contractor shall install new treated wood nailers at the eve and rake edges to match new insulation height. 8. Prospective contractor shall install new Firestone/Elevate grey .60 mil TPO InvisiWeld mechanically fasten roof system to the purlins with purlin fasteners. 9. Prospective contractor shall install the entire roof system to meet manufacturer’s specifications and any state, county, and city building codes. 10. Prospective contractor shall install new roof vent boots/jacks. 11. Prospective contractor shall be responsible for re-sealing all roof penetrations. 12. Prospective contractor shall wrap or cover any exposed lumber with metal or aluminium trim color to best match existing trim color. 13. Prospective contractor shall work during normal park business hours. 14. Prospective contractor shall be responsible for all materials delivered and protection of during construction. 15. Prospective contractor shall be responsible for the daily clean-up and the removal of all demoliton/ constructon debris including nails and metals offsite. 16. Prospective contractor shall be responsible for removing cable or satellite dishes and no dishes shall be attached to new roof. 17. Photographs may be requested by Greg Hart during installation. 18. Prospective contractor shall be responsible for protection of building from elements during construction and the precautions to be taken to prevent damage to landscaping. 19. Park is not responsible for equipment and materials left on project site. 20. All work to be done with in (60days) from me of bid being awarded. 21. Contact Greg Hart 501.554.9704 once project is complete so final inspection can be completed Specifications: For Roof, Ridge cap and Guter Downspouts Contractor to Provide: 1. Prospective contractor shall perform the removal of existing ridge cap and any old sealant, closure under old cap. And the removal of all debris from project site. 2. Prospective contractor shall be responsible for all safety barriers like orange construction fence to keep bystanders out of work areas and at a safe distance or equivalent. 3. Prospective contractor shall be responsible for any permits that maybe required. 4. Prospective contractor shall be responsible for cleaning and preparation ensure all new vent jacks and closers seal properly. 5. Prospective contractor shall furnish all materials, tools and labor, equipment to install new ridge cap Approx. (170’ lin. Ft. ridge cap) and new closure, sealant, and fasteners. 6. The color of ridge cap shall best match existing one thats being replaced. 7. Prospective contractor shall install the new ridge cap system shall meet manufacturers specifications and any state, county, and city building codes. 8. Prospective contractor shall install new roof vent boots/jacks. Roof vent boots & flashing, color to best match existing roof. 9. Prospective contractor shall be responsible for re-sealing all roof penetrations. 10. Prospective contractor shall remove all existing downspouts and reinstall new commercial grade outlets and downspouts and protect all guters during repairs. 11. Prospective contractor shall work during normal park business hours. 12. Prospective contractor shall be responsible for all material delivered and protection of during construction. 13. Prospective 0actor shall be responsible for the daily clean-up and the removal of all demolition/ construction debris including nails and metals offsite. 14. Prospective contractor shall install ice and water shield in all valleys and roof transpirations. 15. Photographs may be requested by Greg Hart during installation. 16. Prospective contractor shall be responsible for protection 17. Park is not responsible for equipment and materials left ton project site. 18. All work shall be done with in (60days) from me of bid being awarded. 19. Contact Greg Hart 501.554.9704 once project is complete so final inspection can be completed.
Bid Results
Playgrounds / Parks / Athletic Fields
$500,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2024
July 8, 2024
490 Toltec Mounds Rd, Scott, AR
Related To This Project
Scott, AR
Bid Date: Sep 11 2024
Scott, AR
Bid Date: May 10 2024
Scott, AR
Bid Date: Jul 26 2022
Scott, AR
Bid Date: Aug 10 2022
Clarksville, AR
Bid Date: May 10 2024
Little Rock, AR
Bid Date: May 21 2024
Pine Bluff, AR
Bid Date: May 21 2024
McGehee, AR
Bid Date: May 21 2024
McGehee, AR
Bid Date: Jun 18 2024
Cherry Valley, AR
Bid Date: May 14 2024
Cherry Valley, AR
Bid Date: May 14 2024
Junction City, AR
Bid Date: Jun 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.