BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Elk Creek, California. Completed plans call for the renovation of a educational facility.

Stony Creek Joint Unified School District Survellance and Vape Detection Question Deadline: May 15, 2024 @ 12:00 pm PST This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations, including but not limited to prevailing wage compliance and Skilled and Trained Workforce requirements. No bidder may withdraw his bid for a period of thirty (30) DAYS after the date set for the opening of the bids This project is anticipated to start after Summer 2024 and is anticipated to have a duration of 120 days. All work shall be completed per the project schedule but no later than the project finish date. Liquidated damages in the amount of $500.00/day are included in this contract. All work shall be completed per the project schedule but no later than TBD. The OWNER reserves the right to reject any or all bids and/or waive any irregularities or informalities in any bids or in the bidding process. Each bid package will be awarded separately and independent of one another. The OWNER may, at their option, choose to award the projects to one contractor or any combination of contractors. The OWNER has determined the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute this contract. These rates are on file at the SCHOOL DISTRICT office located at location. Copies may be obtained upon request. A copy of these rates shall be posted at each jobsite. The schedule of per diem wages is based upon a working day of eight (8) hours. The rate for holiday and overtime work shall be at least time and one-half. No bidder may withdraw his bid for a period of thirty (30) DAYS after the date set for the opening of the bids. A BID BOND shall be required and shall be supplied with the CONTRACTOR'S bid on the day of the bid. All bids shall be presented under sealed cover and accompanied by one of the following forms of bidder's security: cash, a cashier's check, certified check, or a bidder's bond executed by an admitted surety insurer, made payable to the trustees. The security shall be in an amount equal to at least 10 percent of the amount bid. A bid shall not be considered unless one of the forms of bidder's security is enclosed with it A Payment Bond and Performance Bond for contracts over $25,000.00 WILL BE required prior to the execution of the contract. The Payment and Performance Bond shall be in the form called for in the contract documents. Payment Bond and Performance Bond shall be provided upon receipt of the Notice to Proceed. Performance and Payment bonds shall be supplied prior to the beginning of construction. A Certificate of Insurance shall be required as well before work can begin. Respondent will be responsible for all work as described in the Scope of Work, Project Documents, Specifications and Drawings. It is the responsibility of the Respondent to bid a complete and operable solution. If the bidder feels that the system described is not complete, the Bidder must address their specific concerns in writing to the Owner before submitting a quote The Owner will not be responsible for additional costs incurred by the bidder due to the submission of an incomplete bid. All questions concerning this project shall be requested through the project website at https://projects.infinitycomm.com. All requests for information shall be submitted not less than five (5) days prior to the opening of the bid. Any questions submitted after the question deadline will not be answered. All questions will be submitted through the project website. Bidders shall submit only one question submittal. Al questions shall be included in the single submittal. DO NOT submit single question submittals. Failure to comply with this requirement may result in the bidder’s response being negatively scored or rejected completely for failure to comply with the requirements of the RFP. This contract may be extended if mutually agreed on by both parties in writing for a maximum of one year for each occurrence. Contract expiration: December 31,2024

Post-Bid

Educational

$180,000.00

Public - City

Renovation

5

8

4

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
24
Bidding Soon
482
All Active Projects
186
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2024

June 19, 2024

img_map_placeholder

3430 Co Rd 309, Elk Creek, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.