BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Virginia Beach, Virginia. Completed plans call for the renovation of a educational facility.

The procedure for withdrawal of bids shall be according to Chapter 43, Title 11, Section 2.2-4330 (i) of the Code of Virginia, 1950 as amended. The Owner reserves the right to waive informalities and to reject any or all bids. The General contract is to be awarded on a lump sum basis and includes all work as defined in the Contract Documents. If you are physically disabled, hearing or visually impaired and need assistance with the bidding process, please call 711 (TDD-Telephone Device for the Deaf) for further assistance. Bidder questions may be directed to Amanda LeBeau, AIA, HBA Architecture & Interior Design: amandal@hbaonline.com or call (757) 995-7654. The project is generally described as removal and replacement of existing HVAC systems and associated support work. Work includes removal and replacement of existing HVAC units, curbs, ductwork, electrical systems, and acoustical panel ceilings, and new structural supports associated with the HVAC unit replacements. The Work includes removal and replacement of the Kitchen Exhaust Hood. The Work also includes demolition and reconstruction of exterior masonry walls for new louver openings, and membrane roofing system repairs associated with rooftop HVAC unit replacements. Work includes Hazardous Materials Abatement and cleaning of the building interior below or in any area where Hazardous Materials are removed. All Work shall be completed in accordance with the Drawings and Specifications. 1. Phase 1 Work includes all work described as Phase 1 on the Construction Phasing Plans. Phase 1 Work also includes partial HVAC Commissioning work through submission and approval of screen shots. a) On-Site Construction shall commence on June 14, 2025. b) Substantial Completion for Phase 1 Work shall be achieved no later than August 14, 2025. 2.Phase 2 Work includes all work described as Phase 2 on the Construction Phasing Plans. At Contractor's Option, all or portions of Phase 2 Work may be concurrent with Phase 1 Work or Phase 3 Work. Phase 2 Work may also be performed outside of normal school operation hours during the school year provided that work areas are restored to pre-construction conditions and cleaned prior to the start of each and every school day. Phase 2 Work, if performed during the school year, shall be performed between the hours of 4:00 pm and 11:00 pm on Mondays through Thursdays, and between 4:00 pm Friday to 6:00 pm. Sunday for weekends. Weekend work requires 48 hours notice for VBCPS to provide access. 3.Phase 3 Work includes all work described as Phase 3 on the Construction Phasing Plans. Phase 3 Work also includes partial HVAC Commissioning work of Phases 2 and 3 through submission and approval of screen shots. a) On-Site Construction shall commence on June 13, 2026. b) Substantial Completion for Phase 3 Work shall be achieved no later than August 13, 2026. 4.Phase 1a Work includes all remaining HVAC Commissioning Work for Phase 1 after submission and approval of screen shots. a) Substantial Completion for Phase 1a Work shall be achieved no later than September 29, 2025. 5.Phase 3a Work includes all remaining HVAC Commissioning Work for Phases 2 and 3 after submission and approval of screen shots. a) Substantial Completion for Phase 3a Work shall be achieved no later than September 28, 2026. Project No- 23-085 Question Deadline 05/16/2024 Bidders requiring clarification or interpretation of the Bidding Documents shall make a written request to the Architect, to reach him at least seven (7) days prior to the date for receipt of bids.

Award

Educational

$6,812,000.00

Public - City

Renovation

111

22

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
19
Bidding Soon
379
All Active Projects
145
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 14, 2025

img_map_placeholder

1590 Corporate Landing Pkwy, Virginia Beach, VA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.