Site work for a mixed-use development in Bristol, Connecticut. Completed plans call for site work for a educational facility; and playground / park / athletic field.
The City of Bristol is accepting bids for the repair of running track surfaces at two Bristol high schools. Responses received after the required due date and time will not be considered for award. Email Submissions to: Purchasing@Bristolct.gov. Repair of running track surfaces at two Bristol high schools as outlined below, and as noted in Sections 4.1.1 and 4.2.1 of report entitled "Running Track Assessments" as prepared by Loureiro Engineering Associates dated January 31, 2024, attached and made a part of the specification. Repair the broken slot drain section near Location 4 by adhering the top section to the base at the two horizontal connectors and top edge of the drain body. Repair the broken slot drain section between Location 5 and Location 6 by adhering the top section to the base at the two horizontal connectors and top edge of the drain body. Repair the broken slot drain section between Location 8 and Location 1 by adhering the top section to the base at the two horizontal connectors and top edge of the drain body. Install free draining stone base or other base type called-for by the box manufacturer. Install the box in accordance with manufacturer's instructions set to maintain planarity of the field surface across the location. Re-install turf carpet to form level surface with box cover and replace infill. Secure turf material to box cover in accordance with manufacturer's instructions. Repair of running track surfaces at two Bristol high schools as outlined below, and as noted in Sections 4.1.1 and 4.2.1 of report entitled "Running Track Assessments" as prepared by Loureiro Engineering Associates dated January 31, 2024, attached and made a part of the specification. Bristol Eastern High School 632 King Street, Bristol CT Surface Damage and Cracking Repair the area of delamination in the South "D" zone, near Location 2. Fill the hole in the west "D" zone near Location 3. Fill the linear gouge/hole in Lane 1, near Location 7. Fill the linear cracking in the black track coloring at the inside edge adjacent to Drainage System Repair the broken slot drain section near Location 4 by adhering the top section to the base at the two horizontal connectors and top edge of the drain body. Repair the broken slot drain section between Location 5 and Location 6 by adhering the top section to the base at the two horizontal connectors and top edge of the drain body. Repair the broken slot drain section between Location 8 and Location 1 by adhering the top section to the base at the two horizontal connectors and top edge of the drain body. L S ___________ 3. Water Service Boxes Remove infill and turf carpet to gain access to water service box. This may require cutting and re-seaming of the turf, which should be done by a qualified contractor, so warranties are not affected. Remove field base material around water box as required to remove existing box and create space for new installation. Install free draining stone base or other base type called-for by the box manufacturer. Install the box in accordance with manufacturer's instructions set to maintain planarity of the field surface across the location. Re-install turf carpet to form level surface with box cover and replace infill. Secure turf material to box cover in accordance with manufacturer's instructions. Total All Work at Bristol Eastern High School $__________ Bristol Central High School 480 Wolcott Street, Bristol CT 4. Fill the linear cracking at the western portion of the south "D" zone parallel to the end of the synthetic turf field. Fill the numerous small holes (surface damage) observed in the south "D" zone west of the field centerline, near Location 3. It is recommended that the school modify its procedures for the movement of track and field equipment on the track's coated areas to prevent future damage. Fill the large, localized surface damage observed in the south "D" zone west of the discus cage, near Location 4. 6. Water Boxes The three water boxes at the perimeter of the synthetic turf field shall be replaced with new units, set level with the field surface. The new units shall be installed with adequate deep bases set in free-draining material to minimize heaving. Areas at the perimeter of the synthetic turf field where the turf anchoring edge board ("nailer board") is displaced shall be remedied. Remove infill and turf carpet to gain access to water service box. This may require cutting and re-seaming of the turf, which shall be done by a qualified contractor, so warranties are not affected. Remove field base material around water box as required to remove existing box and create space for new installation. Install free draining stone base or other base type called-for by the box manufacturer. Install the box in accordance with manufacturer's instructions set to maintain planarity of the field surface across the location. Re-install turf carpet to form level surface with box cover and replace infill. Secure turf material to box cover in accordance with manufacturer's instructions. 7. Turf System Edging Remove infill and turf carpet to gain access to the areas needing repair. Remove sufficient field base material to gain access to the full depth of the turf anchoring edge board. Inspect the existing turf anchoring edge board for damage that may affect its function. If such damage is noted, replace the entire length of the repair area with a new board, securely fastened to the concrete curb. Re-install turf carpet with appropriate edge anchoring per the turf manufacturer's requirements and re-install infill. Lane 1, between Locations 7 and 8. Fill the crack in the bituminous pavement adjacent to the outer edge of the track near Location 8 up to the edge of the track surfacing. Fill the linear cracking in the black track coloring at the inside edge adjacent to Lane 1, between Locations 8 and 1.
Post-Bid
Playgrounds / Parks / Athletic Fields
$280,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2024
June 19, 2024
Multiple Locations, Bristol, CT
Related To This Project
Bristol, CT
Bid Date: Nov 16 2021
Bristol, CT
Bid Date: Jun 20 2024
Bristol, CT
Bid Date: Jul 01 2024
Bristol, CT
Bid Date: Jun 27 2024
Bristol, CT
--
Bristol, CT
--
Bristol, CT
--
Bristol, CT
Bid Date: May 21 2024
Bristol, CT
--
Bristol, CT
--
Bristol, CT
Bid Date: Apr 29 2024
Bristol, CT
Bid Date: May 02 2024
Bristol, CT
Bid Date: May 03 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.