BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Charleston, South Carolina. Completed plans call for site work for a water / sewer project.

The Commissioners of Public Works ofthe City ofCharleston, South Carolina, is requesting interested Horizontal Directional Drill Contractors complete and submit an Application for Prequalification for serving as the Horizontal Directional Drill Subcontractor for construction ofthe West Ashley Transmission Main Extension Phase 1 Project located in Charleston, South Carolina between Highway 61/Ashley River Road and Main Road, paralleling Bees Ferry Road and the CSX railroad right-of-way. The Work to be performed consists of approximately 27,000 linear feet ofwater main consisting of 36-inch, 30-inch, 24-inch, 16-inch, 12-inch, 8-inch and 6-inch DIP. Included in this work is 2,500 linear foot of42-inch (OD) HDPE water main to be installed by horizontal directional drill. All work within the scope ofthe Project that is to be installed by horizontal directional drill must be performed by a Horizontal Directional Drill (Sub) Contractor pre-qualified by CWS for this project. Please direct all questions to William Cherry, P.E.. Neither the Owner nor Engineer has any responsibility for the accuracy, completeness, or sufficiency ofthe Application, including any Addenda, obtained from any other source All work within the scope ofthe Project that is to be installed by horizontal directional drill must be performed by a Horizontal Directional Drill (Sub) Contractor pre-qualified by CWS for this project. The Owner will not accept bids from Contractors who fail to submit timely applications for prequalification or from Contractors who fail to prequalify. The project will be bid at a later date in accordance with Charleston Water System's procurement requirements and the project bid documents.

Post-Bid

Water / Sewer

$1,833,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
52
Bidding Soon
519
All Active Projects
260
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2024

July 30, 2024

img_map_placeholder

Multiple Locations, Charleston, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.