Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Elsie, Michigan. Completed plans call for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
**As of May 20, 2024, this project has not yet been awarded. A timeline for is May 20,2024.** Resurfacing the parking lots at the High School/Middle School campus, Leonard Elementary, and E.E. Knight Elementary. Work shall include but not be limited to: a. Crack filling as needed b. Pothole repair with Hot Mix Asphalt (HMA) c. Seal coating of all asphalt d. Restriping lots after seal coating. Numbered spots at the High School to be included as well as an added crosswalk in the High School student lot and another in Middle School transfer lot. 3.1 Bus Garage Parking Lot - Pothole repair with Hot Mix Asphalt where needed prior to sealcoating. Crack seal where needed. Sealcoat (2 layers) entire lot. Restripe parking lines. 3.2 High School Lots- Pothole repair with Hot Mix Asphalt where needed prior to sealcoating. Crack seal where needed. Sealcoat (2 layers) entire lots. Restripe parking lines. Repainting of all numbered spots (168). Add a new cross walk from sidewalk to gym entrance. 3.3 Transfer Lot and Ring Road- Pothole repair with Hot Mix Asphalt where needed prior to sealcoating. Crack seal where needed. Sealcoat (2 layers) entire lot and ring road. Restripe parking lines. Add a crosswalk from sidewalk to the transfer lot. 3.4 Middle School Lot- Pothole repair with Hot Mix Asphalt where needed prior to sealcoating. Crack seal where needed. Sealcoat (2 layers) entire lot and part of the entry drive off of Hollister Rd. Restripe parking lines. 3.5 E.E. Knight Elementary- Pothole repair with Hot Mix Asphalt where needed prior to sealcoating. Crack seal where needed. Sealcoat (2 layers) entire lot. Restripe parking lines. 3.6 Leonard Elementary Drop Off Lot and South Lot Only- Pothole repair with Hot Mix Asphalt where needed prior to sealcoating. Crack seal where needed. Sealcoat (2 Layers) entire lots. Restripe parking lines. 3.7 All Bids must include the Total Linear Foot of crack sealing per parking lot and Square foot of Hot Patch for pothole repair. 3.8 Proof of Workers' Compensation and General Liability insurance is required. 3.9 Contractor shall provide items of a minor nature not specifically listed to provide a complete Owner acceptable project. Work must be completed by August 1st,2024 or negotiated date pending supplies and contractor availability. Security may be certified check, bank draft irrevocable bank letter or credit or surety bond. All bidders must be bondable and shall include in the Proposal the cost of furnishing Labor and Material Payment and Performance bonds each in the payable amount of 100% of the proposed bidding sum. The bonds shall hold Ovid-Elsie Area Schools as the oblige. A surety authorized by the State of Michigan must issue bonds. The surety must be listed on the current Federal Register or have an A. M. Best rating of B+ or better. Failure to meet these requirements will be cause for rejection of the bond. The Board of Education reserves the right to reject any or all bids, as well as waive any irregularities and to accept the bid that meets its requirements most satisfactorily I can be contacted at the information below if you have any questions. Thank you for your consideration. OEAS is seeking proposals for resurfacing the parking lots at the High School/Middle School campus, Leonard Elementary, and E.E. Knight Elementary Work shall include but not be limited to: a. Crack filling as needed b. Pothole repair with Hot Mix Asphalt (HMA) c. Seal coating of all asphalt d. Restriping lots after seal coating. Numbered spots at the High School to be included as well as an added crosswalk in the High School student lot and another in Middle School transfer lot. 1.2 Site will be available as soon as possible. Sequencing of work will be coordinated between the Owner and the contractor. The building staff will be responsible for the removal of any equipment that is in the work area. Bus Garage Parking Lot - Pothole repair with Hot Mix Asphalt where needed prior to sealcoating. Crack seal where needed. Sealcoat (2 layers) entire lot. Restripe parking lines. 3.2 High School Lots- Pothole repair with Hot Mix Asphalt where needed prior to sealcoating. Crack seal where needed. Sealcoat (2 layers) entire lots. Restripe parking lines. Repainting of all numbered spots (168). Add a new cross walk from sidewalk to gym entrance. 3.3 Transfer Lot and Ring Road- Pothole repair with Hot Mix Asphalt where needed prior to sealcoating. Crack seal where needed. Sealcoat (2 layers) entire lot and ring road. Restripe parking lines. Add a crosswalk from sidewalk to the transfer lot. 3.4 Middle School Lot- Pothole repair with Hot Mix Asphalt where needed prior to sealcoating. Crack seal where needed. Sealcoat (2 layers) entire lot and part of the entry drive off of Hollister Rd. Restripe parking lines.
Bid Results
Educational
$56,935.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2024
June 14, 2024
Multiple Locations, Elsie, MI
Related To This Project
Elsie, MI
--
Elsie, MI
Bid Date: Feb 04 2022
Elsie, MI
Bid Date: Jan 13 2022
Elsie, MI
Bid Date: Jan 05 2022
Elsie, MI
Bid Date: Oct 20 2020
Belleville, MI
Bid Date: Jun 28 2024
Midland, MI
Bid Date: May 14 2024
Imlay City, MI
Bid Date: May 22 2024
Imlay City, MI
Bid Date: May 22 2024
Farmington Hills, MI
Bid Date: May 21 2024
Charlotte, MI
Bid Date: May 22 2024
Niles, MI
Bid Date: May 15 2024
Hamtramck, MI
Bid Date: May 22 2024
Marshall, MI
Bid Date: May 21 2024
Allendale, MI
Bid Date: May 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.