BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a swimming pool in Peachtree City, Georgia. Completed plans call for the renovation of a swimming pool.

**As of July 15 , 2024 , this project has not yet been awarded. The Project is expected to be awarded Soonest we could award is August 2.** The scope of the Work for this project is the re-roofing of the Kedron Fieldhouse & Aquatic Center. The existing roof will remain in place but be covered with standing-seam metal roof panels and sub-framing supports. The work will also include selective demolition and replacement of flashing, trim, fascia, rakes, gutter, downspouts, and accessories. Refer to the contract documents for a complete description of the required Work. This contract is ARPA funded. Each Bidder must deposit with his bid, security in the amount of 5%. The contract will be awarded to the low, responsive, and responsible bidder with reservation of right to reject all bids. Bids may not be withdrawn by Bidders for 60 days following opening of the bids. The project shall be Substantially Complete within 180 calendar days from the date of Notice to Proceed of the contract. Liquidated Damages shall be assessed in the amount of $200 per day for each calendar day required to achieve Substantial Completion. The project shall be Final Complete within 30 calendar days beyond Substantial Completion. Liquidated Damages shall be assessed in the amount of $200 per day for each calendar day required to achieve Final Completion. The City of Peachtree City provides assurances to Bidder that all anticipated Federal, State, and Local Permits along with anticipated Rights of Way and Easements have been obtained or will be obtained by N/A . The City of Peachtree City will not accept pre-bid project questions within a period of 120 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and Peachtree City Legal Holidays. Agreement will require a Payment Bond in the amount of 110%, and a Performance Bond in the amount of 100% of the project cost. The City of Peachtree City reserves the right to bid a project in phases and award the contract on the phases it deems to be in the City's best interest.

Bid Results

Swimming Pools

$479,840.00

Public - City

Renovation

14

13

23

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
52
Bidding Soon
1,537
All Active Projects
587
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2024

July 19, 2024

img_map_placeholder

202 Fieldhouse Dr, Peachtree City, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.