BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Gower, Missouri. Completed plans call for the construction of a one-story above grade educational facility; and for site work for a educational facility.

As of May 21, 2024, After further discussion, the Bid Opening will be public. Bids will be opened via webinar and can be accessed by the link below: https://tinyurl.com/2mzakepd PLEASE NOTE: - The project will require Buchanan County prevailing wages AWO No. 3 - Bid bonds (5%) are required for the project. payable to Al J. Mueller Construction A. Provide a complete, integrated set of mutually dependent components and assemblies that form a metal building system capable of withstanding structural and other loads, thermally induced movement, and exposure to weather without failure or infiltration of water into building interior. B. Primary-Frame Type: 1. Rigid Clear Span: Solid-member, structural-framing system without interior columns. 2. Rigid Modular: Solid-member, structural-framing system with interior columns. 3. Lean-to: Solid- or truss-member, structural-framing system, designed to be partially supported by another structure. C. End-Wall Framing: 1. Manufacturer's standard, for buildings not required to be expandable, consisting of load-bearing end-wall and corner columns and rafters.

Post-Bid

Educational

$1,000,000.00

Public - City

New Construction, Site Work

227

7

53

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
31
Bidding Soon
729
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

July 16, 2024

img_map_placeholder

500 S 4th St, Gower, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.