EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 24, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Sandwich, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Consists of pavement milling, pavement patching, hot-mix asphalt resurfacing, sidewalk removal & replacement, combination curb and gutter removal and replacement, structure adjustments, restoration, traffic control, pavement striping, culvert removal and replacement and all other ancillary work required to complete the project. City/County Sandwich The Sandwich 2024 Road Program Consists of Partial Depth Patching (649 Sy), Bituminous Materials (Tack Coat) (8755 Lb), Hma Binder Course, Il-9.5, N50 (749 Ton), Hma Surface Course, Il-9.5, Mix "D", N50 (1089 Ton), Hma Surface Removal, Variable Depth (5870 Sy), Hma Surface Removal, 1.5" (4050 Sy), Hma Surface Removal, 3" (3050 Sy), Aggregate Surface Course (20 Ton), Aggregate Wedge Shoulder, Ty. B (111 Ton), Pcc Sidewalk, 5 Inch (8769 Sf), Sidewalk Removal (8579 Sf), Detectable Warnings (152 Sf), Brick Paver Removal and Reset (40 Sf), Comb. Concrete Curb and Gutter Removal and Replacement (210 Lf), Structure Adjustments (11 Ea), Hma Driveway Removal and Replacement (125 Sy), Pipe Culvert Removal And Replacement (58 Lf), Grading and Shaping Ditches (40 Lf), Pavement Marking - Line (2241 Lf), Restoration (982 Sy), and Traffic Control. Proposals Available at Engineering Enterprises, Inc. Via online For No Fee. Project Location: Various Local Roads Within the City of Sandwich Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - The Sandwich 2024 Partial Depth Patching

Bid Results

Roads / Highways

$426,626.00

Public - City

Paving, Site Work

3

6

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
171
Bidding Soon
2,298
All Active Projects
1,002
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 20, 2024

img_map_placeholder

Multiple Locations, Sandwich, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

The Sandwich 2024 Road Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.