BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Marshall, Michigan. Completed plans call for the demolition of a residential development; and for site work for a residential development.

Background This Request for Proposals ("RFP") is being issued by the Calhoun County Land Bank Authority (CCLBA) for demolition services on identified project sites. The CCLBA owned project sites (see Appendix A) are being demolished through grant funding; all projects will be managed by the CCLBA. The CCLBA invites the submission of proposals from certified demolition contractors to provide demolition and site restoration services for assorted sites as listed in Appendix A. Licensed companies with demonstrated experience in this area and an interest in making their services available to the CCLBA are invited to respond to this RFP. Questions Due: May 8, 2024, at 5:00pm If you have trouble submitting questions online, you can contact Tonesha Heath at 269-781-0746 or via email at theath@calhouncountymi.gov However, if there are questions or problems with registration please contact Vendor Registry at 844-802-9202. Answers Available: May 9, 2024, at 5:00pm Tentative Award Date: May 27, 2024 Project Completion Deadline: September 30, 2024 All structures on each parcel will be demolished including garages and/or outbuildings and driveways, unless otherwise stated in this RFP. All garbage and debris (brush, limbs, tires, etc.) must also be removed. Also, all footings and foundations are to be removed pursuant to local municipal requirements, site backfilled with clean (non-hazardous) fill material (sand, dirt), compacted, graded, and seeded. All fill and soil must be tested and meet standards for nonhazardous substances/clean, with certification of such submitted to the CCLBA. Retaining walls are to be removed on a case-by-case basis. Contractors will provide a plan for the recycling of demolished materials when possible. All public sidewalks damaged in the demolition activity will need to be repaired, immediately following site restoration. Demolition activity for this RFP will be taking place in the following jurisdictions with independent inspection departments, agencies and inspectors in the City of Battle Creek, City of Albion, Village of Tekonsha and Bedford Charter Township. Utility shutoffs (electricity, water, and gas) will be arranged for and paid for by the CCLBA. Water and sewer capping will be the responsibility of the Contractor and the Contractor will be responsible for coordinating with the local permitting department/agency for final clearance. Well and septic removal and abandonment is the responsibility of the contractor and projects are indicated on Appendix A. The CCLBA reserves the right to increase or decrease the number of projects based on available funding, historic board approval, or other needs during the term of the contract; it is possible that due to timing or limited funding not all projects will be executed. The CCLBA reserves the right to select the Contractor that best meets its goals and objectives, quality levels, as well as its educational and service level expectations. The CCLBA reserves the right, in its sole discretion, to reject any/or all proposals, to waive any irregularities and technical defects contained therein, to award the contract in its entirety, in part, or not at all and/or to determine which proposal is the lowest and/or best to enter into a Contract, as deemed to be in the best interest of the CCLBA. The CCLBA may also remove properties from the list when circumstances dictate it. The CCLBA may select more than one service provider from the proposals submitted to obtain the most qualified firm(s) or individual(s) for demolition services in order to ensure timely completion of the requested services. The CCLBA seeks sealed proposals from Respondentsto provide demolition, recycling, proper waste disposal, site protection, and site restoration in total compliance with all federal, state and local regulations, for properties identified in Appendix A. The parcels contain blighted residential and commercial structures, and in some cases - debris trash, trash, tires and downed trees, that may need to be removed, when indicated in Appendix A. All structures on each parcel will be demolished including garages and/or outbuildings and driveways, unless otherwise stated in this RFP. All garbage and debris (brush, limbs, tires, etc.) must also be removed. Also, all footings and foundations are to be removed pursuant to local municipal requirements, site backfilled with clean (non-hazardous) fill material (sand, dirt), compacted, graded, and seeded. All fill and soil must be tested and meet standards for nonhazardous substances/clean, with certification of such submitted to the CCLBA. Retaining walls are to be removed on a case-by-case basis. Contractors will provide a plan for the recycling of demolished materials when possible. All public sidewalks damaged in the demolition activity will need to be repaired, immediately following site restoration. Demolition activity for this RFP will be taking place in the following jurisdictions with independent inspection departments, agencies and inspectors in the City of Battle Creek, City of Albion, Village of Tekonsha and Bedford Charter Township. Utility shutoffs (electricity, water, and gas) will be arranged for and paid for by the CCLBA. Water and sewer capping will be the responsibility of the Contractor and the Contractor will be responsible for coordinating with the local permitting department/agency for final clearance. Well and septic removal and abandonment is the responsibility of the contractor and projects are indicated on Appendix A. Environmental assessment and abatement of asbestos and other hazardous materials will be the responsibility of the CCLBA on all regular demolition projects. Once abatement and utility shut offs are complete, the CCLBA will provide a Notice to Commence to the successful respondent prior to the start of demolition activities If you have any questions, please do not hesitate to reach out to our Support Team by email at cservice@vendorregistry.com or toll-free at (844)802-9202. We are happy to help *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Residential Subdivision

$20,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
51
Bidding Soon
1,075
All Active Projects
437
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

May 28, 2024

img_map_placeholder

Multiple Locations, Marshall, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.