BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pipeline in Karns, Tennessee. Completed plans call for site work for a pipeline.

Cut off for questions at 4:00PM on May 6, 2024. Install gas main for two (2) subdivisions. Subdivision one (1) Henderson RD should be completed first and has approximately 280 ft of 4-inch pipe and 2,526 ft of 2-inch pipe for a total of 2,806 ft of pipe. Subdivision two (2) Emory Green should be completed second and has approximately 3,876 ft of 2-inch pipe. The work shall be completed in strict accordance with the drawings and the Contract Documents. CONTRACTOR will provide all labor, materials, equipment, and incidentals as required to restore the Site to a condition equal to or better than the Site condition which existed prior to the initiation of the Work activities. 1.1 SCOPE OF WORK Furnish all labor, materials, equipment, and incidentals required to video tape all construction areas within the project area, as shown on the Drawings and specified herein, prior to any construction activity and after all construction work is complete. 1.2 QUALIFICATIONS A. The video photography shall be performed by a competent camera operator who is fully experienced and qualified with the specified equipment and knowledge of the specific type of construction being performed. B. The audio shall be performed by the camera operator during the recording process. Q & A deadline: May 08, 2024 4:00:00 PM EDT

Post-Bid

Pipeline

$160,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
17
Bidding Soon
466
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

May 29, 2024

img_map_placeholder

Multiple Locations, Karns, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.