Renovation of an educational facility in San Diego, California. Completed plans call for the renovation of a 56,799-square-foot, one-story above grade educational facility.

General Description: Altman Clinical and Translational Institute (ACTRI) is located in the Health Science East area of campus, originally built in 2016 and consists of 4 levels above ground and 3 lower levels partially below ground. Project scope consists of expanding clinical services currently located on Level 1 of ACTRI into an existing Lower Level 2 shell space, L2E600 and L2E11. The proposed area will be designated as a non-licensed clinic (non-OSHPD). It is assumed existing structural, fire protection, mechanical, and electrical systems will have capacity and will not require any system upgrades. Scope will include associated modifications to fire protection, mechanical, and electrical systems to accommodate proposed layout. The University has bid and awarded a CM at Risk Contract to Align Builders, Inc. (hereafter "CM/Contractor"). CM/Contractor is responsible for bidding and awarding all subsequent subcontractor packages, including this package. The successful Subcontractor Bidder shall sign a Subcontract Agreement directly with CM/Contractor and shall be bound by all the terms of the contract between University and CM/Contractor. Refer to the attached "AGREEMENT (CMAR with GMP)" In the "Information Available to Bidders" folder, which contains the contract between University and CM/Contractor, attached to the subcontract bidding documents and incorporated by this reference. o Scope of BP01.01 Final Clean is: The cleaning of the areas of work once prior to punchlist and once prior to final completion. o Scope of BP02.02 Demolition is: Removal and disposal of all MEP, partitions, doors, and other finishes per contract documents. o Scope of BP06.02 Casework and Finish Carpentry is: Fabricate and install casework and countertops per contract documents. Fabricate and install wood veneer paneling on walls and ceilings. o Scope of BP08.01 DFH is: Provide and install all new door/frame/hardware assemblies throughout the space. Include all doors on door schedule. o Scope of BP08.03 Glass & Glazing is: Engineer, fabricate, and install new interior glass, including vision/side lites, and all required accessories and trims. o Scope of BP09.01 Acoustical Ceilings is: Provide and install new acoustical ceilings per RCP and finish plans. o Scope of BP09.03 Flooring & Tile is: Provide and install new floor coverings per the finish drawings. Include all tile on walls and floors as well. Include proper floor preparation, transitions, and trims. o Scope of BP09.08 Painting is: Painting of all surfaces shown to receive paint, both inside and outside. Include proper preparation for painting. Provide and install all wallcoverings per finish schedule. o Scope of BP10.01 Signage is: Fabricate and install new interior signage to match UCSD standards. o Scope for BP10.02 Specialties is: Provision and installation of all specialties, including toilet accessories. o Scope of BP12.02 Window Coverings is: Provide and install new exam room curtains and track where shown. o Scope of BP21.01 Fire Sprinkler is: Design and install modifications to existing Fire Sprinkler system, considering new interior walls. o Scope of BP22.23.01 Plumbing and HVAC is: Safe-off and cut/cap of existing. Provide and install new plumbing and HVAC utilities per plan, including any penetrations for your work. o Scope of BP26.27.28.01 Electrical, Fire Alarm, Low Voltage, & Security Systems is: Safe-off and cut/cap of existing. Provide and install all fixtures, equipment, wiring, raceways, etc. Design and install code compliant Fire Alarm modifications to existing JCI/Simplex system, to be submitted and approved as a deferred approval. Provide and install all tele/data cabling. Provide an add alternate to provide and install all access control devices and door controls (card readers/keypads, etc). PN - 5493 Bid Package 06.01 Insulation/Framing/Drywall The estimated construction cost of this bid package is $173,045. Requests for clarification or interpretation of the Bidding Documents are due by 12:00P.M., Thursday, May 9, 2024 and shall be addressed only to: Bethany French, Project Manager: BFFrench@ucsd.edu cc: Sosilva@ucsd.edu

Bid Results

Educational

$1,484,763.00

Public - State/Provincial

Renovation

61

25

21

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
41
Bidding Soon
1,055
All Active Projects
471
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

July 22, 2024

img_map_placeholder

9452 Medical Ctr Dr, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.