BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a fire / police facility in Homestead, Florida. Completed plans call for the renovation of a fire / police facility; and for site work for a fire / police facility.

The purpose of this quote is to retain a qualified contractor to provide materials, equipment and labor for the West Gate Installation (Solar Powered) at Homestead Police Department . Contractor shall furnish, including, but not limited to, all labor, materials, equipment, skills, tools, permitting cost, supervision as necessary for proper completion of the work and to carry out this agreement in compliance with the requirements stated or implied by these specifications (see Scope of Work). Award may not be based solely on price but also timeliness of contractor to complete scope of work in accordance with the City's schedule. West Gate (Emergency Gate) Installation on Solar Motor - Design and Construction of a Solar Operated Gate. A new gate, 'solar power operated system' will be installed on the west side of Homestead Police Department. The gate will be completely battery powered with a solar charger and not attached to an electrical grid. Contractor shall furnish, including, but not limited to, all labor, materials, equipment, skills, tools, permitting cost (if applicable), supervision, services as necessary for proper completion of the West Gate Installation at PD. The work to be performed shall include, but is not limited to the following: o CSL24UL Liftmaster Commercial Slide 24V Operator / 50ft 1500lbs #41 Chain and 1 Photo Sensor o Liftmaster 20 Watt 24V Solar Panel Kit with Bracket and 10' Cable o Liftmaster Solar Battery Harness for Solar 24V / works on New DC LA500 CSL24V CSW24V o 12V - 7 AMP Battery (2) o Concrete Pad for Motor 2x2 o V - Track - 50' o V- Track's Concrete Pad- 50' (25 front part/ 25 back part) o Radio Receiver - Multicode o Double Photo Beam- Transmitter and Receiver - To Install across of the opening o Test new unit and verify unit is operational to manufacture standards Clean, remove and dispose of all debris from site. Work to be performed during working business hours

Award

Fire / Police

$14,548.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
46
Bidding Soon
922
All Active Projects
382
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

June 10, 2024

img_map_placeholder

45 NW 1st Ave, Homestead, FL

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.