BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Winter Springs, Florida. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Counties: Seminole Road Name: SR 419 Drainage Repair Limits: Midpoint Project(s): 41232657255(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Days: 60 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 14 Please Read the Full Advertisement Description: FDOT District 5 Proposal ID No.: E50D6 Financial Project No.: 412326-5-72-55 Fiscal Year: 2024 County: Seminole Contract Calendar Days: 60 Lead Time: 14 Days This is a Maintenance Pay Item Contract. Intent: The work under this Contract consists of the roadside and drainage repair on SR 419 in Seminole County. Work includes the replacement of sidewalk and concrete ditch pavement; installation of drainage structures and pipe; and removing, preserving, and replacing the existing handrail. Experience: For this Contract the Contractor is required to have at least three (3) years of experience in the performance of Drainage Repair, or the Project Superintendent must have at least three (3) years of like experience as a Superintendent. A Contractor that presently has a certificate of prequalification with the Department in "Drainage" will suffice to meet the above requirements. Question Deadline 05/28/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 - Drainage Repair - SR 419

Award

Water / Sewer

$224,767.00

Public - State/Provincial

Paving, Site Work

10

7

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
347
Active Projects
161
Bidding Soon
2,468
All Active Projects
1,037
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 4, 2024

June 14, 2024

August 13, 2024

img_map_placeholder

FL-419, Winter Springs, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.